Advertisement

Uni Drill
Manufactured by:
Dealer / Local Agent
:
Taege Engineering Ltd
Main West Road,
Sheffield 7500
New Zealand
Ph: 64 3 318 3824
Fax: 64 3 318 3646
E-mail:
sales@taege.com
www.taege.com
1
13/10/2016
A Ground Breaking Company Since 1923

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Uni Drill and is the answer not in the manual?

Questions and answers

Summary of Contents for Taege Uni Drill

  • Page 1 Uni Drill Manufactured by: Dealer / Local Agent Taege Engineering Ltd Main West Road, Sheffield 7500 New Zealand Ph: 64 3 318 3824 Fax: 64 3 318 3646 E-mail: sales@taege.com www.taege.com 13/10/2016 A Ground Breaking Company Since 1923...
  • Page 2: Table Of Contents

    Contents Page Introduction Safety Safe Operating Procedures Maintenance Storage Removing the End Tow Getting the Drill ready for the first time Understanding Calibration Calibration Drilling Speed Setting the Sowing Depth Drill Operation End of Day Removing the Sponge Bar Assemblies Fitting the Sponge Bar Assemblies Bolted Connections Tyre Pressure...
  • Page 3: Introduction

    New Zealand farmers and contractors. Taege Engineering want you to be satisfied with your drill, which has been designed and manufactured to provide years of dependable use. By following our owner’s manual (using, service, maintenance etc) the life span and the second-hand value of the machine can be extended.
  • Page 4: Safety

    Safety  Focus on being prepared for emergencies.  Read the operators manual carefully.  Always follow recommended safe practices for operating this drill and its associated equipment, including tractors and other machinery used in conjunction with this drill.  Identify and avoid un-safe terrain. ...
  • Page 5: Safe Operating Procedures

    SAFE OPERATING PROCEDURES  Before operating the Taege Drill please read the following ‘Safe Operating Procedures’.  Failure to comply with these warnings could result in serious injury.  A careful and alert operator is the best insurance against incidents.
  • Page 6: Maintenance

    MAINTENANCE Daily  Grease all grease points Weekly  Check the tyne nuts and wheel nuts are tight  Check hitch points for wear. Replace when necessary.  Replace tynes if bent only by those recommended by the manufacturer. STORAGE ...
  • Page 7: Understanding Calibration

    Setting the Sowing Depth  Your TAEGE drill is fitted with HD Flexible “S” tynes which contact the ground at a specific pre-set angle which gives greater contour following and penetration.
  • Page 8: Drill Operation

     Push down the Taege Snap locks and remove the sponge bars by putting sideways pressure on the bar (away from the motor) until it clears the drive shaft.
  • Page 9: Fitting The Sponge Bar Assemblies

    Fitting the Sponge Bar Assemblies  Locate the plain end of the sponge bar within the spring-loaded bearing on the side of the drill under the seed/fertilizer hoppers applying sufficient even pressure along the bar.  Depress the spring in the bearing block so the collar on the motor end of the roller bar clears the end of the slotted driven shaft on the other end of the drill.
  • Page 10: Tyre Pressure

    Tyre Pressure The recommended tyre pressure is 26 -28.5Kpa (18-20psi) for the land wheels. The drill will bounce excessively if the land wheel tyres are over inflated. The jockey wheel is a solid tyre Stand Always check the stand is stored correctly. 13/10/2016 A Ground Breaking Company Since 1923...
  • Page 11: Maintenance

    Maintenance  Drill to tractor auxiliary connection Electrical Connections  Lead connections  Wiring loom for damage  Drawbar pin located and pinned Drawbar  Drawbar lynch pins Bolts  All bolts  Top baffle tri-nuts  Tyne tip bolts Tynes ...
  • Page 12: Notes

    NOTES 13/10/2016 A Ground Breaking Company Since 1923...
  • Page 13: Warranty Certificate

    Warranty From the date of purchase your TAEGE machine is covered by a 12-month warranty period for faulty parts and/or workmanship. Ensure your dealer completes and returns a warranty certificate within 7 days of date of purchase. Send to Taege Engineering Ltd...

Table of Contents