10. Operation & Check-Out Procedures
BEFORE YOU RUN WATER THROUGH THE SYSTEM:
1.
Allow the cemented fittings adequate time to dry per manufacturer's directions.
2.
Verify that the check valves, control valves,
and vacuum breakers are installed properly.
3.
Verify that all plastic panel clamps and stainless steel hose clamps are tight.
4.
Verify that all anchors are secure and that adequate
silicone was used to prevent any roof leaks.
5.
Be sure all collector riser tubes are snapped into the
spacer bars (except where they go around obstructions).
6.
Be sure that the collector riser tubes are NOT rubbing on the roof surface
between the spacer bars. If they are, adjust the spacer bars as needed to
prevent this or a hole may develop in the riser tube.
7.
Be certain that the system will automatically drain down when the pump
is shut off or that enough manual drain valves have been installed.
8.
Verify that all pipe runs are properly supported with pipe clamps.
That's all there is to it. You have installed the UniverSol Replacement Kit.
If you run into any problems with your installation
BE SURE TO COMPLETE THE PRODUCT REGISTRATION INFORMATION
ON THE BACK OF THE WARRANTY AND REMIND YOUR CUSTOMER TO
COMPLETE THE PRODUCT REGISTRATION AT UMASOLAR.COM.
Installation Manual
or have any future problems, call UMA Solar at:
800.79.SOLAR
CONGRATULATIONS!
12

Advertisement

loading

This manual is also suitable for:

Universol 32Universol 40Universol 48