Do you have a question about the PKA and is the answer not in the manual?
Questions and answers
Summary of Contents for GTP PKA
Page 1
Separator Purge Automatic Cycle Timer Record Your Model, Serial Number and Other Information on the back of this document. Manufacturing: Bypass & Filter Feeders, Glycol Feed Packages, Separators & Separator Systems, Tanks, Tank Stands, Chemical Batch Mixers, Corrosion Coupon Racks, Packaged Feed Systems and Custom Systems P.O.
Page 2
Contents Page 1.0 Introductions 2.0 Warranty 3.0 Unpacking 4.0 Location and Environment 5.0 Installation and Wiring 6.0 Pressure and Temperature Limitations 7.0 Routine Maintenance 8.0 Parts Listing 9.0 Wiring Diagram 10.0 Trouble Shooting 11.0 Notes 12.0 Model and Serial Number *** WARNING –...
Page 3
5.1 CONNECTING TO SEPARATOR Purge valve should be installed at the bottom or drain connection of the separator. Be sure to use isolation valve supplied for servicing. Plumb outlet of purge valve to floor drain or collection/clarifying system. 5.2 WIRING VALVE TO TIMER Timer and valve are supplied with seal tight cord clamps and power cords. Valve and controller can be hard wired.
Page 4
Hard wire to valve 115VAC: Terminal 4 Ground Terminal 5 Nuetral Terminal 6 Hot Wiring diagram is based on standard GTP valve(s). Please Consult factory for non-standard valves. 10.0 TROUBLE SHOOTING If you are having trouble, please visit www.gtpcompany.com or contact customer service.
Need help?
Do you have a question about the PKA and is the answer not in the manual?
Questions and answers