5.2 Connecting control panel ...................... 14 5.3 Connection of access control system (optional) ..............14 comprehensive examination ......................17 6.1 Visual inspection and check of the product readiness for use ..........17 COMMISSIONING OF THE MOUNTED PRODUCT ............... 18 K-14 Swing gate Installation Guidelines...
Page 3
VZR.248100.000 IG This Installation Guidelines (IG) is applied to Oxgard K-14 swing gate and its variants (hereinafter referred to as Product). Product firmware version: FW v1.0 This IG establishes rules and procedure for the product installation and start-up. Before installing the product, it is necessary to additionally read Operation Manual VZR.248100.000 OP.
INSTALL THE PRODUCT OUTSIDE DRY AND HEATED ROOMS. PREVENT OR ACCELERATE THE MOVEMENT OF THE PRODUCT LEAF DURING SWITCHING ON (OFF) ANTI-PANIC MODE - AP. APPLY FOR THE PRODUCT CLEANING PASTES AND LIQUIDS CHEMICALLY AGGRESSIVE TO MATERIALS OF HOUSING. K-14 Swing gate Installation Guidelines...
DEATH AND DAMAGE TO HEALTH, COMPLETE OR PARTIAL LOSS OF PERFORMANCE OF THE PRODUCT AND (OR) AUXILIARY EQUIPMENT IF USER FAILS TO COMPLY WITH SAFETY REQUIREMENTS SPECIFIED IN THIS SECTION, AND ALSO WILL VOID YOUR WARRANTY ON THE PRODUCT. K-14 Swing gate Installation Guidelines...
Open transportation box, unpack and inspect completeness of the product: Swing gate; Control panel with cable. Rules of the product visual inspection 3.3.1 Check completeness of the product. Completeness should be checked according to VZR.248100.000 DTS Product status record. K-14 Swing gate Installation Guidelines...
Requirements to the product installation place ATTENTION: TO AVOID WAVING AND (OR) OVERTURNING DURING OPERATION, INSTALL THE PRODUCT SECURELY. IN CASE OF PRODUCT INSTALLATION ON FLOOR OF LOW STRENGTH - TAKE MEASURES FOR FLOORS STRENGTHENING IN THE PLACE OF INSTALLATION. K-14 Swing gate Installation Guidelines...
Prepare horizontal platform at the product installation site. 4.2.2 Prepare channel or cable duct from the installation site to power supply unit and, if required, to ACS and security and fire alarm system connection point. K-14 Swing gate Installation Guidelines...
Page 9
Insert in the gate cables from control panel, power supply and, if necessary, cables for ACS and security and fire alarm system. Perform cabling through a hole with a diameter of 20 mm. Fasten the cables with cable ties. K-14 Swing gate Installation Guidelines...
4) dismantle 4.3.2 Before packing, clean the product of dust and dirt. 4.3.3 Pack the product in a packing box. K-14 Swing gate Installation Guidelines...
1 - Cover; 2 – Insert; 3 - Indication panel; 4- Body housing; 5 – Cap; 6- Glass; 7- Upper housing; 8 - Location of cross-board Components arrangement Figure 3 - on the gate post K-14 Swing gate Installation Guidelines...
Page 12
J3 – not installed: standard opening speed of the gate; installed: accelerated by 5 percent gate opening. –J4 jumper is always not installed, it can be used to organize normal operation of bus of CAN2.0 standard. K-14 Swing gate Installation Guidelines...
Connect ( + ) and ( - ) terminals of power supply unit to terminals (24V) and (GND), respectively. Make sure that the cable is securely connected. Install the door and lock it. K-14 Swing gate Installation Guidelines...
ACS controller should be connected to a group of terminals Access Control System on the cross-board. ATTENTION: THE PRODUCT IS NOT INTENDED FOR PERSONNEL TIME TRACKING. Marking of terminals: LEFT, RIGHT, STOP, AP, GND. Terminal assignment is shown in Table 3. K-14 Swing gate Installation Guidelines...
Page 15
STOP input is a potential one, i.e. the product operates in proper mode as long as the input is grounded to GND terminal, after the terminal opening – the product enters "Stop" mode regardless of what mode was before ACS operation. K-14 Swing gate Installation Guidelines...
Page 16
Also, LEDs indicating grounding of corresponding input to GND terminal are installed on the cross-board: D4 signals receipt of LEFT input signal; D5 signals receipt of RIGHT input signal; D6 signals receipt of STOP input signal; K-14 Swing gate Installation Guidelines...
Turn on power supply of the product and carry out check of operation by making several test cycles. 6.1.4 If any extraneous noise and violations of operation modes are not found, the product is ready for operation. K-14 Swing gate Installation Guidelines...
Product status record in the section "Product movement in the course of operation"; "Data on installation" section of 248100.000 DTS on the product is Product status record filled in; Act of acceptance in operation is made out. K-14 Swing gate Installation Guidelines...
Need help?
Do you have a question about the K-14 and is the answer not in the manual?
Questions and answers