Page 1
Installation and Operation Manual PVG-4 Rapid Shutdown Device Address: 2570 N. First Street, Suite 200, San Jose, CA 95131 TEL: +1 888-598-9901 Japan Address: 812-0011 福岡市博多区博多駅前 3-10-24 藤井ビル 1F TEL: +81 092-433-3252 FAX: +81 092-433-3171 China Address: No.1 Anhe Rd Tsingtao Export Processing Zone, Tsingtao, China 266113...
Page 2
COMPANY PROFILE Northern Electric & Power Inc. (NEP) was founded in the United States and has manufacturing and R&D facilities in China. The mission of the company is to develop cutting-edge clean energy technologies and provide state-of-the-art solar inverter products to its customers. The first round of investment to the company was US$20 Million, with a planned total investment of US$50 Million.
Page 3
1. INTRODUCTION 2. SAFETY INSTRUCTION 1.1 Prefix WARNING: Dear customer, thank you for choosing the PVG rapid shutdown devices. We hope you will find our products meet your need for renewable energy. Meantime, we appreciate your feedback PLEASE READ THIS MANUAL BEFORE INSTALLATION. ANY DAMAGE TO THE PRODUCT DUE TO NOT regarding our products.
Page 5
Connecting BDG-256 gateway to PVG-C is optional, and shall not affect the rapid shutdown Step-1: Plug AC adapter into the PVG-C function of PVG-C and PVG-4. Step-2: Release the E-Stop button on PVG-C WARNING: ONE PVG-C CAN ONLY MONITOR ONE CHANNEL OF PV PANELS (ONE MPPT).
Page 6
7. SPECIFICATION MODEL PVG-n Max Recommended PV Power 450(*n) INPUT(DC) Max DC Open Circuit Voltage 80 per input Max DC Input Current (Adc) Maximum Output Power (Wp) 0 ~ 450(*n) OUTPUT(DC) Maximum Output Current Maximum Output Voltage 0 ~ Voc(*n) Maximum System Voltage 600/1000/1500 SYSTEM...
Need help?
Do you have a question about the PVG-4 and is the answer not in the manual?
Questions and answers