PROCEDURE
S
T
E
P
1
S
T
E
P
1
:
M
o
u
n
:
M
o
u
n
A
.
Retrieve the Vertex Jackpot Controller and Switch box from Tek Chek.
A
.
B
.
Set the Jackpot Controller inside the holding bracket on the Test Cart as shown.
B
.
C
.
Connect the Power cable into the Vertex box (See No.1 below)
C
.
D
D
.
.
Connect the DVI cable (already connected to the LCD) to the Vertex box (See No. 2).
Plug one end of the CAT5 Vertex cable (supplied on Test Cart) into the Ethernet Port on the front
E
E
.
.
of the Vertex box (See No. 3 below).
F
.
Open the front cover on the Vertex box, and connect the Keyboard USB cable (No. 4).
F
.
24-00163-00
T h i s d o c u m e n t c o n t a i n s c o n f i d e n t i a l i n f o r m a t i o n t h a t i s p r o p r i e t a r y t o A r i s t o c r a t . I t m a y n o t b e c o p i e d o r d i s c l o s e d t o u n a u t h o r i z e d p a r t i e s .
Do you have a question about the Aristocrat Vertex and is the answer not in the manual?
Questions and answers
Summary of Contents for Viridian Aristocrat Vertex
Page 1
™ ™ This procedure provides instruction to setup and test the communication between a bank of machines and a Vertex Jackpot Controller during Production. REQUIREMENTS 25ft CAT6 Cable 07-21139 24-Port Switch 07-30086 Vertex Jackpot Controller 579849 Test Cart – Equipped with: LCD Monitor USB Keyboard with Built-in USB Hub USB Mouse...
Page 2
™ ™ Set the 24-port Switch Box inside the designated shelf on the conveyor. Connect the CAT5 Vertex cable to the Switch. If necessary, disconnect the existing CAT5 cable from the Carrier Assembly. Connect the Retractable CAT5 Machine cable to each corresponding EGM. For each CAT5 Machine cable connected, plug the corresponding Switch cable into the Switch.
Page 3
™ ™ Turn the Vertex Jackpot Controller ON (switch is located on the front of the box). When the Vertex Shell appears on the Test Cart LCD, make note of the Vertex IP Address (lower right) for future reference (you’ll need it to link the Jackpot Controller with the Bank). Proceed with the following steps once every machine has finished booting up.
Page 4
™ ™ … … On the G2S menu, follow the onscreen instructions to “add host address.” HOST SETUP When the onscreen keyboard appears on the EGM Main LCD, enter the Vertex IP Address. The Host Address (Vertex IP Address) MUST be entered in the following format: 192.168.1.21/g2shost.
Page 5
™ ™ … … Follow the onscreen instructions to return to the “previous menu” (G2S CONFIGURATION MENU On the G2S , select Communications Setup. CONFIGURATION MENU When the G2S Communications Setup screen appears, make note of the EGM ID. Follow the onscreen instructions to “return to the previous menu” to the Operator Mode Menu. Turn the Audit Key to reboot the machine.
Page 6
™ ™ … … Click OK to return to the Vertex Shell. Verify the Controller is “Running.” The Controller must be “Running” before moving onto the next step. On the Vertex Shell, double-click User Interface. Log in to the system to access the Vertex Administrator application. Login credentials for this procedure (case sensitive): admin Password1...
Page 7
™ ™ Select Casino Management from the Modules dropdown menu. On the Casino Management main window, click the Add button to open the Casino List. Enter the name and address of the Casino associated with the order, and click Save Select EGM Management from the Modules dropdown menu On the EGM Management main window, click the Add button When the Add EGM box appears, enter the EGM ID (noted earlier) of the first EGM.
Page 8
™ ™ … … When finished linking the entire Bank of machines, verify the EGMs are communicating properly with Vertex. Once a machine is linked, the EGM ID will appear in GREEN when the machine is successfully communicating with the Jackpot Controller. The EGM ID will appear in to indicate faulty communication.