Page 1
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
PBG-‐100/120/140/160
SYSTEM
M ANUAL
Automated
M otorized
H ydraulic
T raffic
C ontroller
...
Page 2
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
...
Table
o f
C ontents
Section
1
-‐
P re-‐Installation
P lanning
a nd
C onsiderations ........1
1.1
W ARNINGS
A ND
N OTICES ....................... 1 ...
Page 4
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
4.3.5
O n-‐Going
M aintenance
T asks:
H ydraulic
P ump ..............64 4.4
P ossible
F ield
R epair
T asks ....................64 ...
Page 5
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure
1 7
–
W ood
B locks
U sed
U nder
t he
P late,
3
L ocations
( 1
o f
3 ) ......22
Figure
...
Page 6
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure
4 3
–
R eplacement
o f
I nner
P anels
C ontrol
a nd
N on-‐Control
C abinets .... 39
Figure
...
Page 7
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure
6 9
–
M anual
G ate
L owering
i n
C ase
o f
P ower
L oss
o r
O ther
U nusual
E vent. 62
Figure
...
Page 8
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
vi
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Section
1
-‐
P re-‐Installation
P lanning
a nd
C onsiderations
1.1
W ARNINGS
A ND
N OTICES
The
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
1.2
P roduct
M odel
N umbers
The
P BG-‐100/120/140
a nd
/ 160
a re
a vailable
w ith
c lear
w idths
o f
1 0,
1 2,
1 4,
a nd
1 6
f eet,
respectively,
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
1.6.3
S ample
P BG-‐120
R H
a nd
L H
L ayout
Figure 5 -- PBG-120 LH DB (Left Handed, Double Buttress) ...
Page 17
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 7 -- PBG-120 RH DB (Right Handed, Double Buttress)
9
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
1.6.4
S ample
P BG-‐160
R H
a nd
L H
L ayout
Figure 8 -- PBG-160 LH DB (Left Handed, Double Buttress) ...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
1.6.5
S ample
P BG-‐100
S pecial
L ayouts
Figure 9 -- PBG-100 LH SB (Left Handed, Single Buttress) ...
Page 20
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 10 -- PBG-100 LH-RH DB (Left & Right Handed, Double Buttress) 12
...
Page 21
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 11 -- PBG-100 LH-RH DB (Left & Right Handed, Double Buttress) Typical
L ane
L ayout
w ith
M aximum
S ystem
G ap
13
...
Page 22
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
INTENTIONALLY
B LANK
14
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Section
2
–
P hysical
I nstallation
2.1
I nstallation
P lanning
Often
w hen
a
S pike
S ystem
i s
i nstalled,
a nother
l ower-‐cost
b arrier
g ate
i s
i nstalled
i n
f ront
o f
t he
Spike
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
2.3
P late
B arrier
G ate
C omponent
W eights
Component(s)
Component(s)
Weight
( pounds)
Weights
...
Page 25
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 13 – Inner Panel Removal from Control and Non-Control Cabinets Tool
R equired
Tool
T ype
Tool
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
2.7
S aw
C ut
I nductive
L oop
V ehicle
D etector
a s
P reparation
f or
I nstallation
...
Page 28
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 15 – Inductive Loop Vehicle Detector (Saw Cut Loop) Beneath Cabinet Refer
t o
A ppendix
B
f or
f urther
i nformation
o n
t he
O ptional
I nductive
V ehicle
D etector
installation.
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
2.8
P late
a nd
C abinet
P lacement
a nd
P reparation
( Left
H and
S hown)
First,
...
Page 30
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 17 – Wood Blocks Used Under the Plate, 3 Locations (1 of 3) Figure 18 – Wood Blocks Used Under the Plate, 3 Locations (2 of 3) ...
Page 31
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 19 – Wood Blocks Used Under the Plate, 3 Locations (3 of 3) 23
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
2.8.3
H ydraulic
C ylinder
I nstallation
t o
B arrier
P late
Install
t he
H ydraulic
C ylinders
t o
t he
P late
B arrier
i n
t wo
p laces
( right
a nd
l eft
s ides
o f
P late)
a s
.
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Section
3
–
H ydraulic,
E lectrical,
a nd
C ontrol
I nstallation
3.1
...
Page 36
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 26 – Two Hoses Routed Through Track to Non-Control Cabinet Figure 27 – Pulling Two Hydraulic Hoses Through PBG Control Cabinet ...
Page 37
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 28 – Two Hoses Routed to Non-Control Cabinet Figure 29 – Placing Track in Position Above Hoses. BE
V ERY
C AREFUL
T O
N OT
P INCH
E ITHER
H OSE
WHEN
...
Page 38
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
When
t he
h oses
h ave
b een
e xtended
t hrough
t he
t rack
t o
t he
N on-‐Control
C abinet,
c arefully
route
...
Page 39
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 31 – Hydraulic Hose Connection, Non-Control Cabinet Tool
R equired
Tool
T ype
Tool
S pecification
...
Page 40
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 32 – Hydraulic Hose Connection, Control Cabinet Figure 33 – Hydraulic Hose Connection, Non-Control Cabinet 32
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Make
s ure
t hat
t he
h ydraulic
h oses
a re
n ot
k inked
a nywhere
a nd
d o
n ot
r ub
a gainst
a ny
sharp
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 35 – Adjust Cabinet Locations to Ensure ½” Gap between Plate and Cabinets 3.2.2
A nchor
B olt
I nstallation
...
Page 43
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Tool
R equired
Tool
T ype
Tool
S pecification
Hammer
D rill
o r
...
Page 44
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 38 – Cleaning Pilot Holes After Drilling Figure 39 – Secure Anchors with Wrench for Final Attachment 36
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
3.3
V erify
P roper
A lignment
o f
U pper
L imit
S witch
w ithin
C ontrol
C abinet
Verify
...
Page 46
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 41 – Location of Upper Limit Switch, Control Cabinet Figure 42 – Location of Lower Limit Switch, Control Cabinet, Reference Only ...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
3.4
R eplace
I nside
P anels
f or
C ontrol
a nd
N on-‐Control
C abinets
...
Page 48
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
WARNING
-‐ -‐
W hen
s ervicing
t he
s ystem,
t his
s witch
s hould
b e
p laced
i n
t he
O FF
p osition
and
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 45 – Location of Flexible Conduit Installation to AC Junction Box (Note:
T he
b end
i n
t he
f lexible
c onduit
s hould
b e
m ore
g radual
t han
d epicted
a bove.
3.6
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 47 – Location of Traffic Control Mounting Adapter, Control Cabinet Install
t he
t raffic
c ontrol
l ight
f ixture
a s
s hown
i n
t he
f igure
a bove.
T his
s tep
i s
o ften
performed
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 49 – Traffic Control Signal Wiring Tool
R equired
Tool
T ype
Tool
S pecification
...
Page 52
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 50 – Installation Location of Field Connection Barrier Operator Tool
R equired
Tool
T ype
Tool
S pecification
...
Page 53
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 51 – Limit Switch Wiring (Usually Performed at Factory) 45
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
3.8
I nstallation
E lectrical
R eference
I nformation
Component
Photo
C allout
Component
...
Page 55
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 53 – Siemens S7-1200 PLC, Control Cabinet -- With (Top) and Without (Bottom) Covers Removed 47
...
Page 56
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 54 – Siemens PLC Wiring Scheme 48
...
Page 57
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 55 – Schneider LC1 D25 Relay, Control Cabinet 49
...
Page 58
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 56 – TB 1 Terminal Block, Installation Wiring, Control Cabinet 50
...
Page 59
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 57 – TB 1 Terminal Block, Factory Wiring, Control Cabinet 51
...
Page 60
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 58 – TB 2 Terminal Block, Factory Wiring, Control Cabinet 52
...
Page 61
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 59 – TB 2 Terminal Block, Installation Wiring, Control Cabinet 53
...
Page 62
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 60 – Momentary On/Off Operation Switch, Wired at Factory, Control Cabinet 54
...
Page 63
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 61 – Momentary Switch in OFF or Neutral Position Figure 62 – Momentary Switch in Up (Raise) Gate or Barrier Plate ...
Page 64
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 64 – Left Side Electrical Schematic, Control Cabinet 56
...
Page 65
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 65 – Right Side Electrical Schematic, Control Cabinet 57
...
Page 66
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 66 – Entire Electrical Schematic, Control Cabinet 58
...
Page 67
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 67 – Motor/Pump and Fluid Reservoir, Control Cabinet 59
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
release
v alve
i n
t he
c lockwise
d irection
w ill
a llow
t he
g ate
t o
g o
d own
m anually.
E nsure
that
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
4.3.3
H ydraulic
H ose
C onnections
Hoses
a nd
f ittings
c onnected
t o
t he
p ump
s hould
b e
c lean
a nd
f ree
o f
a ny
b urs,
oxidation
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
4.3.5
O n-‐Going
M aintenance
T asks:
H ydraulic
P ump
BEFORE YOU USE A MATERIAL, REFER TO THE WARNING: MANUFACTURES’...
Page 73
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 70 – Replacing a Damaged Plate to a Non-Damaged Hinge Assembly Tool
R equired
Tool
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
4.4.3
C levis
I nstallation,
C ontrol
C abinet
Using
n uts,
w ashers
a nd
b olts
( four
e ach),
i nstall
a
c levis
t o
t he
i nner
w all
o f
t he
C ontrol
C abinet
as
...
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
4.5
M aintenance
R eference
I nformation
Gate Access Controller I/O Terminal Address Description Voltage Notes Main Power Terminal Block 110 VAC Switched Power Terminal Block...
Page 78
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Gate Access Controller Output Terminal Address Description Voltage Notes Gate arm controller signal common No power from controller Gate arm controller signal open dry No power from contact controller...
Page 79
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Terminal Board 1 From 30 Jumper 32 Inductive Loop Detector 5 (Red) Down Limit Switch (Brown) Up Limit Switch (Black) DIa L+ PLC DIa M (24VDC -) PLC DIa 1M...
Page 80
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Terminal Board 2 From Jumper 1 to 2 Jumper 2 to 3 Schneider, 5L3 (Red) PLC 2L (Red) PLC DQb .7 PLC DQb .0 PLC DQa .0 PLC DQa .1...
Page 81
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Inductive Loop Vehicle Detector Model LMA-1150-HV AC Line 120V TB-2 35 AC Neutral TB2-47 Output Relay, Common TB-1 32 Output Relay, Normally Open (Closes for DETECT) TB1-16 Loop Input TB1-25...
Page 82
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
74
...
o f
m erchantability,
o r
f itness
o r
s uitability
f or
a ny
p articular
p urpose,
activity
o r
l ocation.
Spike Systems will in no event be liable for any loss of business, profits, data or use, or any direct, indirect, incidental or consequential damages resulting from any such defect in materials or workmanship.
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Once
a ll
w ires
a re
i n
p lace,
s eal
t he
c ut
g roves
w ith
s elf-‐leveling
c oncrete
o r
S ikaflex
...
Page 87
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 76 – Typical Inductive Vehicle Detection Module (Saw Cut Control) 79
...
Page 88
Spike
S ystems:
P BG
S ystem
F amily
I nstallation
Figure 77 – Wiring of Optional Inductive Vehicle Detection Module (Saw
C ut
C ontrol),
C ontrol
C abinet
...
Need help?
Do you have a question about the PBG Series and is the answer not in the manual?
Questions and answers