Summary of Contents for Peri UP Flex Staircase 100 with Deck UDG
Page 1
PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to NASC SG4:15 – Edition 01 | 2019...
Page 2
Amendment Log Version Details Issue Date First Issue Jan. 2019...
Assembling the base Assembling the first level Assembling additional levels Assembling the top level Anchoring Dismantling Application Base reactions PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
The assembly steps presented are examples using the illustrated component sizes. They are also valid for alternative component sizes. PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 5
*Ledger UH may be replaced by Ledger UH Plus **Steel Deck UDG may be replaced by Industrial Deck UDI PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
1.00m. and 1.25m. bay options. Components highlighted in red indicate temporary installed components removed before completion of the tower. PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
All anchor connections to the supporting structure should be tested in accordance with NASC TG4:17 Anchoring Systems for Scaffolding. PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Steps, slopes and changes in level can be UJB 38-50/30 accommodated using adjustment of the Fig.A1-3 Adjustable Base Plates / Base Spindles. PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 9
Do not secure Ledger wedges at this stage The decks used at the base are an aid to erection only, they may be removed later. Fig.A1-8 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
UVB level using a 500g hammer. Place provisional Ledgers UH 100 (3c) shown in red, they will be removed later. Fig.A2-3 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 11
Deck C at the opposite end of the Ledger 100 (3c). Then from a standing position Fig.A2-5b Fig.A2-5c insert Deck D. PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 12
Attach UBK 250/200 (10) as intermediate guardrails and remove temporary Ledger Fig.A2-8 UH 100 (3c) above stairs. First lift completed. PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
When pushing the slider forward, the securing device drops down and holds the Horizontal Brace UBH. (Fig. A3.2b) Fig.A3-2a Fig.A3-2b Fig.A3-2 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 14
Fig.A3-3 A3.4 H-Braces UBH Attach Horizontal Braces UBH 100/100 (12b) before next stage. Fig.A3-4 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 15
Ledger UH 100 (3c) above stairs. Additional lift completed. Repeat steps as required according to tower height. Fig.A3-7 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Vertical Standards UVR (5), then securely fix all wedges at UVB level using a 500g hammer. Place UBL 200/200 (11a). Fig.A4-2 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 17
Top lift completed. Install Toeboards UPY 200 (14) and Toeboards UPY 100 (13) to all platforms if required Fig.A4-4 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Corner Standards with Wall Ties UWT 45 or scaffold tube (15). (Fig.A5-1a) Fix Wall Ties or scaffold tubes to the wall. Fig.A5-2 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 19
At the intersection point of the diagonal Scaffold Tubes, use Swivel Couplers to connect both Scaffold Tubes. (Fig. A5-3 and Fig. A5-4) Fig.A5-3 Fig.A5-4 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Remove Ledgers UH 250 (3a), UH 200 (3b) and UH 100 (3c). Remove UVR 200 (5a) and UBK 250/200 (10). (Fig.A6-3) Top lift removed Fig.A6-3 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 21
Remove UVR 200 (5a) and UBK 250/200 (10). Intermediate lift removed Repeat steps as required according to tower height. Fig.A6-5 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 22
Remove UVR 300 (5) and UBK 250/200 (10). From the ground, remove final base components. Dismantling completed Fig.A6-8 Fig.A6-9 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
19.5 20.4 44.3 12.2 19.8 21.1 46.3 12.4 20.5 21.6 48.3 12.9 20.9 22.3 50.3 13.1 21.5 22.8 Fig.A7-1 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 24
18.8 18.2 34.3 11.5 19.7 18.7 36.3 12.0 20.0 19.6 38.3 12.3 20.9 20.1 40.3 12.8 21.1 20.9 Fig.A7-2 PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling – Short lift system to SG4:15...
Page 25
PERI Ltd Contact information 1.0 Rugby Head and Registered Office Market Harborough Road Clifton upon Dunsmore Rugby CV23 0AN Tel: +44 (0)1788 861600 2.0 Brentwood 3.0 Glasgow 4.0 Leeds Warley Street 331 Charles Street Office Suite C Great Warley Glasgow...