Do you have a question about the DM-250 and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Riedex DM-250
Page 1
USER MANUAL MOBILE EXTRACTION UNIT 5000 M³/H + 31(0) 517 26 92 41 | info@riedex.nl | www.riedex.nl Hoofdstraat 17 | 8811 HD | Ried, the Netherlands D U S T E X T R A C T I O N S Y S T E M S...
ablE of contEnts able of conTenTs haptEr able of conTenTs ser manUal escripTion of The machine 2.1 I nstallatIon 2.2 E lEctrIcal InstallatIon 2.3 c onnEctIng hosE and or pIpIng 2.4 r EcyclIng afeTy 3.1 g EnEral safEty rEgulatIons 3.2 s afEty rEgulatIons for maIntEnancE rEpaIrs and adjustmEnts 3.3 s...
sEr manual 1.0 U ser manUal The following warnings and symbols are used in this manual: Gives suggestions and advice so as to make certain tasks easier or more convenient. NOTE A comment with additional information, alerts you to po- tential problems.
Page 5
sEr manual This instruction manual describes NOTE the installation, operation, use and maintenance of the extraction unit. Read this instruction manual carefully! In some instances, the diagrams and Follow the instructions before using the drawings that have been used may extraction unit.
Page 6
sEr manual LAYOUT This user manual contains information for users of the extraction unit. The manual is divided into va- rious sections, the titles of which are stated at the top of each page. USERS The term ‘user’ is defined as anyone who operates, maintains, adjusts, cleans, repairs or performs any other work on or with the extraction unit.
2.0 D escripTion of The machine The DM-250 is a machine that can be used for the following purposes: The extraction of non-spark-generating* woodworking machines with recirculation of the used air. The extraction unit consists of filter sleeves with an underlying reservoir and a fan that is based on negative pressure.
Page 8
EscrIptIon of thE machInE Figure 1. Main machine components.
EscrIptIon of thE machInE nstallatIon TRANSPORT ARRIVAL The extraction unit is supplied fully as- The machine must be checked immedi- sembled. The shipment will be on a pallet ately upon arrival! For transport damage and the machine can be unloaded with a or missing parts you must immediately forklift.
ÜBERLASTUNG START/ HAND HAUPTSCHALTER Transformator Start Fuses Off / position for automatic operation BEDEUTUNG LAYOUT ZEICHNUNG - MONTAGEPLATTE ANZICHT Riedex B.V. Duration Funktion Cleaning switched on Hoofdstraat 17 8811 HD Ried The Netherlands info@riedex.nl Reset fan Thermal fault indicator light...
* Een doorlopende aarding moet worden verzekerd. Only with a DM-250/P: For the operation of the filter cleaning it is necessary to connect the dust extractor to a compressed air supply by means of a ½...
Isposal Isposal If, after many years of use, the extraction unit reaches the end of its lifecycle, then remove it and dispose of it appropriately. Disconnect the extraction unit from the power supply by disconnecting the power from the machi- nery.
TRK value of 2 mg/m3 is not exceeded. DUST EXTRACTION UNIT ENTSTAUBER NOTE Type DM-250 DM-350 Serial no. Seriennr. 350001 250001 Accidents are often caused by a succession of spe-...
afEty EnEral safEty rEgulatIons WARNING DANGER Observe the general safety regulations. RISK OF FIRE AND EXPLOSION Avoid sparks or other possible sources of ignition at all times. Suction hoses must be electrically conductive, earthed against electrostatic charges and fire-retar- GUARDS dant.
Page 15
afEty CHANGES AND ADJUSTMENTS TO RETURN AIR THE MACHINE The filtered air from the extraction unit can be cir- culated back into the room where it was extracted. In order to avoid risks and to ensure op- When processing oak and beech wood, 50% of the timum performance, no changes, additi- returned air must be fresh air from outside.
afEty afEty rEgulatIons for maIntEnancE rEpaIrs and adjustmEnts LEVENSGEVAAR WARNING Always observe the safety regulations for An electric shock can cause serious injury or maintenance, repairs and adjustments. even death. Always disconnect the extrac- tion unit from the power supply before car- rying out work on the extraction unit.
afEty afE work mEthod WARNING NOTE Observe the following safety regulations to To avoid the risk of an explosion, keep the ensure the work is carried out safely. area around the extraction unit clean and free of dust. GENERAL INFORMATION OPERATORS Always start the extraction unit first before The machine operators must read this in-...
4.0 U Irst commIssIonIng The following steps must be carried out during the ini- NOTE tial commissioning of the extraction unit: DIRECTION OF ROTATION • Check the direction of rotation of the fan. This must Stop the machine immediately if a match the arrow stickers.
IltEr clEanIng Filter cleaning DM-250/M Every time the extraction unit is switched off, an automatic cleaning cycle follows by means of the motor vibration of the filter hoses. If during operation the indicator lamp of the differential pressure switch lights up, the extraction unit must be switched off as quic- kly as possible so that the cleaning cycle can be carried out.
EbruIk onnEctIng multIplE machInEs EstrIctIons on usE If more than one machine is connected The extraction unit DM-300 was built ac- to the extraction unit, each machine cording to the GS-HO-07, version 11.2015, must be shut off with a slider from the and are tested to this standard by the Prüf- extraction unit.
• Volume flow test • Checking the rubber seals of the drain • Visual inspection of the compressed air tank (only for DM-250/P) *Executed by a skilled person *Executed by a skilled person...
alfunctIons 6.0 m alfUncTions The extraction unit Thermal failure won´t start • No main voltage, check the fuses • One or two pre-fuses may have jumped. • Main switch is set to 0/Off. Replace all 3 fuses. Set the main switch to •...
7.0 s pare parTs 16 17 18 Onderdelentekening DM-250 RIEDEX Hoofdstraat 17 8811 HD RIED tel. 0517-269241 fax 0517-269366 Dust extraction system www.riedex.nl e-mail info@riedex.nl All versions Only for DM 250/M Pos Item no. Pce. Description Pos Item no.
2: p nnEx nEumatIc schEdulE comprEssEd aIr clEanIng Pneumatic schedule compressed air cleaning (only for DM-250/P) Compressed air tank Contents: 9,4 liter Max. Boundary pressure: 8 bar Operational pressure: 6 bar Pos. Item no. Pce. Description F200.001 Compressed air tank F200.002...
Page 26
The undersigned of this declaration is the authorized representative for compiling the technical documenta- tion. Ried, the Netherlands, 10.11.2018 Ing. R. Faber, director of Riedex BV...
Need help?
Do you have a question about the DM-250 and is the answer not in the manual?
Questions and answers