Download Print this page

Danfuss 132B0303 Installation Instructions

Cradle for power card & busbar vlt automationdrive fc 360

Advertisement

Quick Links

Installation Instructions
Cradle for Power Card & Busbar
®
VLT
AutomationDrive FC 360
The instructions provide information about the replacement of
the cradle in the J6 enclosure type of the VLT
tionDrive FC 360.
Only Danfoss-authorised, qualified personnel is allowed to
repair this equipment. The personnel must be familiar with the
instructions and safety measures described in the
®
VLT
AutomationDrive FC 360 Service Manual.
1.1.1 Items Supplied
Items supplied depend on ordered code number and
enclosure type of the frequency converter.
Code number
Items supplied
132B0303
Cradle for power card & busbar, enclosure type
J6
1.1.2 Tools Required
Screwdrivers:
-
Flat-edged
-
T10
-
T20
T25
-
T30
-
N8 socket wrench
N10 socket wrench
N5 Allen key
1.1.3 Safety Instructions
®
Automa-
DISCHARGE TIME
The frequency converter contains DC-link capacitors, which
can remain charged even when the frequency converter is
not powered. Failure to wait the specified time after power
has been removed before performing service or repair work,
could result in death or serious injury.
Voltage [V]
380-480
High voltage may be present even when the warning LEDs are off!
Danfoss A/S © Rev. 2014-02-12 All rights reserved.
WARNING
1.
Stop the motor.
2.
Disconnect AC mains, permanent magnet type
motors, and remote DC-link power supplies,
including battery back-ups, UPS, and DC-link
connections to other frequency converters.
3.
Wait for the capacitors to discharge fully, before
performing any service or repair work. The duration
of waiting time is specified in Table 1.1.
Minimum waiting time (minutes)
4
0.37-7.5 kW
Table 1.1 Discharge Time
15
11-75 kW
MI06S102

Advertisement

loading

Summary of Contents for Danfuss 132B0303

  • Page 1 Code number Items supplied connections to other frequency converters. • 132B0303 Cradle for power card & busbar, enclosure type Wait for the capacitors to discharge fully, before performing any service or repair work. The duration of waiting time is specified in Table 1.1.
  • Page 2 1.1.4 Installation Replacing the Cradle for Enclosure Type J6 ® Follow the instructions in VLT AutomationDrive FC 360 Service Manual to remove the power card. Detach the power card from the cradle. Replace the cradle. Reinstall other unmounted components in reverse order.