Download Print this page

Eco-Chic KENNEDY Instructions Manual

Full-size rail

Advertisement

Quick Links

Kennedy
Full-Size Rail Instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the KENNEDY and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eco-Chic KENNEDY

  • Page 1 Kennedy Full-Size Rail Instructions...
  • Page 2 DO NOT FULLY THIGHTEN THE BOLTS UNTIL THE CRIB IS COMPLETELY ASSEMBLED. HARDWARE 3” MACHINE BOLT BARREL NUT 1.75” MACHINE BOLT CURVE WASHER 1.5” MACHINE BOLT LOCK WASHER 0.75” MACHINE BOLT 0.75” WOOD SCREW ALLEN WRENCH x 10 LEFT BRACKET RIGHT BRACKET Kennedy Toddler Full-Size Rail Page 2...
  • Page 3 HARDWARE FOR CRIBS SEPERATE HARDWARE FIRST FOR EASIER INSTALLATION Page 3 Kennedy Toddler Full Sized Rail...
  • Page 4: Parts List

    Parts List Headboard Footboard Left Rail Right Rail Center Support Center Support Leg Footboard Legs (From Crib) Kennedy Toddler Full-Size Rail Page 4...
  • Page 5 Step one: Attach Bracket to the Footboard Step two: Attach Footboard Legs to the Rail Footboard Legs are required for this step. Please Detach From Crib Footboard. Kennedy Toddler Full-Size Rail Page 5...
  • Page 6 Step three: Attach Rail to the Headboard DO NOT OVERTIGHTEN THE BOLTS. Step four: Attach Rail to the Footboard DO NOT OVERTIGHTEN THE BOLTS. Kennedy Toddler Full-Size Rail Page 6...
  • Page 7 Step five: Attach Center Rail to the Left Rail & Right Rail. *ADJUSTABLE HEIGHT Kennedy Toddler Full-Size Rail Page 7...