Vibe Critical Link RAPAWK2.5M Installation Instructions

Rapid fit wiring kit for vibe powerbox400.1m-v7

Advertisement

Connections

Chassis ground
RAPAWK2.5M / RAPAWK5M
Rapid Fit Wiring Kit
Installation instructions for VIBE
Powerbox400.1M-V7
Ensure that correct polarity is
observed or a lack of bass will
result.
Note : using this kit does not
require the remote turn on wire to
be connected to the amplifier.
If you are unsure, please contact
your nearest authorised VIBE
dealer.
Connect to
fuse box
Powerbox 400.1M fuse
Max 30A
Original system fuse

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Critical Link RAPAWK2.5M and is the answer not in the manual?

Questions and answers

Summary of Contents for Vibe Critical Link RAPAWK2.5M

  • Page 1 RAPAWK2.5M / RAPAWK5M Rapid Fit Wiring Kit Installation instructions for VIBE Powerbox400.1M-V7 Connections Ensure that correct polarity is observed or a lack of bass will result. Note : using this kit does not require the remote turn on wire to be connected to the amplifier.
  • Page 2 Limited Warranty All VIBE products carry a full 12 month warranty, valid from the date of the original receipt and proof of purchase (UK only). The online warranty card should be completed within seven days of the original purchase date. The original receipt and packaging should be retained for this twelve month period.

This manual is also suitable for:

Critical link rapawk5m

Table of Contents