LeadSolar Link Gateway
Installation & Operation Guide
September 27, 2016
Ver 1.2
LeadSolar Link Gateway Installation and Operation Guide 
www.leadsolarenergy.com 

Advertisement

Table of Contents
loading

Summary of Contents for LeadSolar Link

  • Page 1 LeadSolar Link Gateway Installation & Operation Guide September 27, 2016 Ver 1.2 LeadSolar Link Gateway Installation and Operation Guide  1  www.leadsolarenergy.com ...
  • Page 2 All information, specifications and illustrations in this manual are those in effect at the time of printing. LeadSolar Energy reserves the right to change specifications or design at any time without notice. For latest information about our products, please go to www.leadsolarenergy.com...
  • Page 3: Table Of Contents

    5. REGISTER ID OF INVERTERS ....................12 6. GET SYSTEM PERFORMANCE INFORMATION ............... 13 7. OTHER CONFIGURATIONS ....................... 14 APPENDIX ............................19 EXPLANATION OF PROFESSIONAL TERMS ................19 DATASHEET OF LEADSOLAR LINK GATEWAY ................19 FAQ ..............................20 LeadSolar Link Gateway Installation and Operation Guide  3  www.leadsolarenergy.com ...
  • Page 4: Gateway Introduction

    Please check all goods in the box according to the following list: 1 X LeadSolar Link Gateway Please contact with the installer or LeadSolar Energy, if you find there is missing good or damaged good in the above list. 1.2 LED and Ports 当前无法显示此图像。...
  • Page 5 State Note Service PLC communication auxiliary button, built-in website reset button. Press the button for 10 seconds, the gateway will back to factory settings. Reboot Reboot the gateway.   LeadSolar Link Gateway Installation and Operation Guide  5  www.leadsolarenergy.com ...
  • Page 6: Gateway Installation

    2.2 Three phase system The gateway for three phase system does not have a power line filter inside. You should use external 50A PLC filters for each phase. The package of three phase gateway has a “N” label on it. LeadSolar Link Gateway Installation and Operation Guide  6  www.leadsolarenergy.com ...
  • Page 7: Setup Gateway Connection

    • active DHCP function of the router. Turn on the gateway and wait for two minutes, you can log in your router and check the IP address of the device list. If you see LSBOX-XXXX, which is LeadSolar Link Gateway.
  • Page 8 12345678. If your device connects with the gateway successfully, your device will get an IP address, such as 192.168.192.16. Input the IP address (http://192.168.192.1) of the gateway on your web browser of your PC, Pad or • mobile, you can log on following web page. LeadSolar Link Gateway Installation and Operation Guide  8  www.leadsolarenergy.com ...
  • Page 9: Log In Built-In Webpages

    Please set the correct local time. Press ”click set time”, and press “Now”, the gateway will get instant • time from your PC. Then press “Done” and “Confirm”. When you see a dialog box that means you have set the time successfully. • Then you go to the Dashboard page. • LeadSolar Link Gateway Installation and Operation Guide  9  www.leadsolarenergy.com ...
  • Page 10: Setup Gateway Mode

    Go to Setting page and enter into Settings drop-down menu to set up your gateway mode. • 4.1 You have Internet connection If you have Internet connection, you should choose Client Mode. So the gateway will forward data to LeadSolar web monitoring servers through your router. LeadSolar Link Gateway Installation and Operation Guide  10  www.leadsolarenergy.com ...
  • Page 11: You Do Not Have Internet Connection

    If you have Internet connection, you should connect the gateway to your router by cable or WiFi. And you need to register an account on LeadSolar on line monitoring platform. Then you register the gateway and inverters on your account. After that, you can get system performance information on web site or built-in web pages of the gateway.
  • Page 12: Register Id Of Inverters

    If you have registered inverters on our online monitoring platform, your registered inverter list in the gateway will be placed by inverters in monitoring platform database. Because the gateway will download inverter list when it is power on. LeadSolar Link Gateway Installation and Operation Guide  12  www.leadsolarenergy.com ...
  • Page 13: Get System Performance Information

    Power diagram of the system updates one time per hour. • Historical energy diagram shows power generation of each day in one year. The data can be recorded • in the gateway for 10 years. LeadSolar Link Gateway Installation and Operation Guide  13  www.leadsolarenergy.com ...
  • Page 14: Other Configurations

    System Info shows gateway hardware and software information • In Settings drop-down menu, you can input SSID and password of your router to set Gateway Mode • from AP mode to client mode.You also can set time and gateway password. LeadSolar Link Gateway Installation and Operation Guide  14  www.leadsolarenergy.com ...
  • Page 15 Client Mode: If you have Internet connection, you can set Client Mode to connect the gateway to your router. So data from inverters will be forward to LeadSolar web monitoring servers by the gateway and your router. If you set the wrong SSID or password, you can change them by connecting Ethernet cable from router to the gateway.
  • Page 16 Set built-in web pages log in password: input password and press confirm button. • System upgrade: you can upgrade software of your gateway in the Update drop-down menu. Wait for 2 • to 3 minutes, you will be prompted for whether the upgrading success or not. LeadSolar Link Gateway Installation and Operation Guide  16  www.leadsolarenergy.com ...
  • Page 17 If you have connected the gateway to your router by Ethernet cable or WiFi, you just need to keep the • gateway accessing to the Internet for 24 hours. The gateway will download update file from the server and upgrading itself. LeadSolar Link Gateway Installation and Operation Guide  17  www.leadsolarenergy.com ...
  • Page 18 Please keep the gateway connecting to the Internet. LeadSolar will do regular upgrading for the gateway software. If you turn off the gateway or disconnect it from the Internet, your online account cannot get data of your • system from your gateway. But if you power on the gateway or connect it to the Internet again, it can upload the date for the past 7 days.
  • Page 19: Appendix

    At user’s home, SSID is the name of the wireless network. So LeadSolar gateway needs to get the right SSID and password to connect with the router via WiFi. There should be no space before or after SSID.
  • Page 20: Faq

    2. Q: How many microinverters can be connected with the gateway? A: It supports connecting with 200 pcsLeadSolar microinverters (LS250, LS600 or LS1500). 3. Q: Can I use LeadSolar gateway to monitor inverters of other brand? A: No. 4. Q: How long can the gateway record the data from microinverters? A: 10 years.
  • Page 21 LeadSolar Energy Co, Ltd. Room 402, Building A1, 228# Linghu Ave, Wuxi, Jiangsu, China, 214135 Tel: +86 510 81817488 Fax: +8651081817475 info@leadsolarenergy.com www.leadsolarenergy.com Copyright © 2012 LeadSolar Energy Co., Ltd. All rights reserved. LeadSolar Link Gateway Installation and Operation Guide  21  www.leadsolarenergy.com ...