Summary of Contents for Norfolk Greenhouses BCCPSW3820+G
Page 1
Ultimate Carport 3.8m BCCPSW3820+G / BCCPSW3825+G Assembly Instructions IMPORTANT Please read these instructions thoroughly before starting assembly. Check all parts are present before assembly, call 020 3011 2040 for replacement parts. These instructions should be kept in a safe place for future use.
Page 2
Canopy Introduction Thank you for your purchase of our Carport, we hope you enjoy. Please read through these instructions and familiarise yourself with the construction process before you begin. We operate a programme of continuous product improvement and we reserve the right to change the specification without prior notice, the latest model is supplied.
Page 8
Frame Assembly Canopy Step 1 - Fix HBD brackets to both RL17A, as per configuration below Step 2 - Fix both RL17A beams to wall Offer both RL17A to the wall and measure from ground to underside of beam. Align horizontally using a spirit level and mark the holes.
Page 14
Roof Assembly Canopy Step 12 - Fix SR6 roof sheet to the front left corner of roof frame. Place first sheet of SR6 in the front left corner of the roof, position so that there is a 50mm overhang from front beam (see image right).
Page 16
Roof Assembly Canopy Step 15 - Position SR7 on top of first SR6, tight against the wall and fix. Fix using 9x SC6X32 on exposed edge and every 3rd corrugation as shown. Step 16 - Fix remaining 3x SR7 sheets Fix each sheet using 8x SC6X32 every 3rd corrugation as shown.