INSTALLATION INSTRUCTIONS PT-A-910
Prisoner Transport Thermometer
TOOLS REQUIRED:
Power drill
5/16" drill bit
PARTS and HARDWARE SUPPLIED:
1
Dual Display Thermometer
1
Temp probe cover / guard
2" x 2" Velcro Hook
1
2" x 2" Velcro Loop
1
4
#10 x 3/4" Phillips pan head sheet metal screw
INSTALLATION INSTRUCTIONS:
1. Install one (1) CR2025 battery into Digital read out display.
2. Use buttons on back of display and adjust settings as desired.
3. Mount digital read out display with 2" x 2" Velcro. The temperature probe wire length
will limit display location. Front upper side of bulkhead is recommended.
4. Drill small hole in desired location of prisoner compartment ceiling to fit probe through.
(5/16" diameter recommended).
5. Drill four (4) holes to mount 2" x 3" temperature probe cover / guard.
6. Run rear probe wire from digital read out display to rear mount / vented guard location.
7. Attach probe on the protected side of guard with a wire tie.
8. Digital read out display has probe built in for drivers compartment temperature sensing.
9. Display will show front and rear temperature.
Wrench set
Phillips screwdriver
Safety goggles
PRM97500
KKM99043
AB-15-0405
AB-15-0406
GSM33195
PT-A-910_INST_2-17
Need help?
Do you have a question about the PT-A-910 and is the answer not in the manual?
Questions and answers