Download Print this page

TAVLIT ADIR Series Installation And Maintenance Instructions

Advertisement

Quick Links

ADIR Semi – Automatic 2"-3" filters TDS
Installation and maintenance instructions
Box contents
Main filter body – picture 1
Flush valve 2" FF – picture 2
Flush valve 1/2" FM – picture 3
Pressure indicator kit – picture 4
Pressure indicator.
o
6 mm tube length 20cms (long).
o
6 mm tube length 15cms (short).
o
2 Female threaded couplers 6 mm
o
2 connectors 1/4"M to 6 mm elbow
o
1 connector 1/4"F to 6 mm elbow
o
1 connector 1/4"F to 6 mm adaptor
o
Assembly
Connect the 2" flush valve to the bottom of the filter cup,
(no need to use Teflon, valve is self-seal).
Make sure handle open position is away from filter cup.
Connect the ½" flush valve to the flush screen outlet, (no
need to use Teflon, valve is self-seal).
Pressure indicator:
Connect two 1/4"F couplers to filter body top
o
outlets.
Connect two elbow 1/4"M to the couplers.
Connect elbow 1/4"F to the bottom of the
o
indicator.
Connect 1/4"F adaptor to side of the indicator.
o
Press fit the indicator to the slots on the filter
o
body.
Connect long 20cms tube from Filter inlet port to
o
indicator bottom (marked "+").
Connect long 15cms tube from Filter outlet port
o
to indicator side (marked "-").
Hydraulic fitting may require Teflon to seal.
o
Filter is ready for installation – picture 5
Installation
Filter can be installed in vertical position or at 90° to the
pipe, (Flush valve pointing down or to the side).
Ensure proper flow direction as clearly marked on the
filter.
Make sure both flush valves are closed.
It is recommended to install a shut off valve before the
filter for maintenance.
Filter is ready for first operation
1
Picture 1
Picture 5
A
950mm
B
795mm
C
235mm
Picture 2
Picture 3
Picture 4

Advertisement

loading

Summary of Contents for TAVLIT ADIR Series

  • Page 1 ADIR Semi – Automatic 2”-3” filters TDS Installation and maintenance instructions Box contents • Main filter body – picture 1 • Flush valve 2" FF – picture 2 • Flush valve 1/2" FM – picture 3 • Pressure indicator kit – picture 4 Pressure indicator.
  • Page 2 First Operation • Open the water source and check for leaks. • Perform 2-3 flushing cycles as outlined below. • Filter is ready for use. Flushing the filter • The disc element needs to be cleaned when the head loss across the filter reaches 0.5-0.7 bar and the red pin protrude from the pressure indicator.
  • Page 3 Periodic Maintenance Warning: • Before servicing the filter make sure it is empty of water and the inlet valve is closed. • Never open the filter under pressure! to release pressure open the lower or secondary flush valve Secondary flush port •...
  • Page 4 Technical Specifications • Available sizes: 2” 3”. • Max. working pressure: 10 bar. • Min. flushing pressure: 2 bar. • Max. Flushing pressure: 6 bar. • Max. flow rate: 2” 25 m^3/h 3” 50 m^3/h • Available in 40 – 140 mesh. •...

This manual is also suitable for:

Adir 2”