Summary of Contents for CommScope BUDI-2S
Page 1
BUDI-2S I N S T A L L A T I O N I N S T R U C T I O N TC-925-IP Rev A, Mar 2017 Building distributor www.commscope.com Introduction Suitable for FTTH applications where easily pre-connectorized splitters modules can be build in.
Page 2
2.1.5 Cut into the rubber seal to open the cable port. 2.1.6 Install the cable with the termination unit into the box, Click the termination unit in one of the ports foreseen for the termination units and install the cable in the rubber seal. Start with termination unit positions 1, 2, 3 and finally 4.
Page 3
Splice 1-6 Splice 7-12 2.2.2 Install the tube with fiber into the cable entrance and secure with the tie-wrap. 2.3.2 Fibers who will be spliced can be stored in this storage area, fibers who will be used later should be routed to the dark storage area trough the port shown on the picture.
Page 4
2.3.4 The pigtails should be stripped when entering the storage area 2.3.6 Close the storage area with the dark fiber storage tray. in a straight line. In case of splitters 2.3.5 Splice the pigtails and store the splices in the splice holder, first 2.4.1 Install the splitter into the splitter holder, take care of the use the left holder as shown on the picture, this to avoid crossings when...
Page 5
2.4.2 Install the outgoing pigtails of the splitter into the designated adaptors. Store the overlength into the storage area. Patchcords 2.5.1 Install the patchcords into the designated adaptors. 2.5.3 Install the patchcords into the designated adaptors and install them into the rubber seal one on top of the other as shown on the picture.