Lift one side of the roof structure and insert the legs (3). Pull the roof (12) over its supporting
structure and tie it securely in place. Lift the other side of the roof structure up and insert the remai-
ning shanks.
Hang the side panels.
The pavilion can be tied down with guy ropes or some other form of anchoring if required.
Warning
The wrong way is grasp only the leg fabric which is welded on the roof,
it is easy to rip the leg fabric off from the welding point of the main roof.
Please NEVER do it this way!
6x12 meter party-tent goundbar system
1. Pipe
No.2: 1940mm long pipes, 18pcs
2. Connector
B: Three way connector for side wall, 10pcs
C: Three way connector for door, 4pcs
A: Three way connector, 4pcs