Underhill Novo Operation Manual page 20

63-station 2wire converter
Table of Contents

Advertisement

Note: When entering this menu, automatic operation from the host
controller is suspended.
2. To advance to the desired station press the RIGHT or LEFT buttons.
3. When a station is running, the screen display will change from "READY" to
"RUNNING", with the station number and time left displayed underneath the
station currently selected.
4. To turn the station "On", press the Up "+" green button. The station run time is
shown next to 'RUNNING' , shown as h:mm:ss and displays remaining time once
the station is started.
5. To turn the station "Off, " press the green button Down "-" button
6. To select the next desired station, press the RIGHT or the LEFT buttons.
7. The default runtime is 2 minutes. To select a shorter runtime press, the "Less"
button to the left of the Manual menu button.
Note: Approximately1-2 seconds will elapse before the next station
turns on.
ADVANCED FEATURES
The Novo can be used with PLC or SCADA-type host products that can monitor
and alert when a decoder fails to turn "on" or "off. " There are 3 relay terminals,
Normally Open (NO), Common (COM) and Normally Closed (NC) available,
see Figure 17-2 to locate these terminals. This requires a hardwire path between
the Novo and a PLC or SCADA product for this advanced feature to operate.
When connected to a PLC or SCADA product and a faulty station is being
operated, the NO and COM are connected.
Pressing the OFF button,
immediately stops any currently
operating irrigation and turns
off power to the 2Wire path to
decoders.
The Novo is turned off until the
"Run" menu is selected.
See Figure 19-1.
ADVANCED NO / NC INPUTS
Figure 17-2
17

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Underhill Novo

Table of Contents