Table of Contents

Advertisement

Quick Links

Operation manual
Operation manual Z130-SE | 05/2016

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Z130-SE and is the answer not in the manual?

Questions and answers

Summary of Contents for ZURN Z130-SE

  • Page 1 Operation manual Operation manual Z130-SE | 05/2016...
  • Page 2: Foreword

    Kapellenstraße 1 D-74638 Waldenburg D – 74214 Schöntal Tel: +49(0)-7942-94736-0 Tel: +49(0)-7943-9105-0 Fax: +49(0)-7942-94736-10 Fax: +49(0)-7943-9105-33 E-Mail: info@zuern.de Customer service: Internet: www.zuern.de Tel: +49(0)-7942-94736-15 Tel: +49(0)-162-6837712 2/52 | Operation manual Z130-SE | 05/2016 3/52 | Operation manual Z130-SE | 05/2016...
  • Page 3: Table Of Contents

    13.11. Speed of the machine fluctuates excessively ............ 49 7.9.6. Adjusting header load relief springs ............... 28 13.12. High belt wear ..................... 49 7.9.7. Adjusting header skids .................. 29 4/52 | Operation manual Z130-SE | 05/2016 5/52 | Operation manual Z130-SE | 05/2016...
  • Page 4 14.11. Propulsion ....................51 14.12. Steering ....................... 51 14.13. Brakes ......................52 14.14. Tyres ......................52 14.15. Dimensions and weight ................. 52 14.16. Options ....................... 52 6/52 | Operation manual Z130-SE | 05/2016 7/52 | Operation manual Z130-SE | 05/2016...
  • Page 5: Health And Safety Instructions

    • Never re-fuel in the vicinity of naked flames or sparks! • Never smoke while re-fuelling! • Never re-fuel in closed spaces! • Immediately clear up spilt fuel! 8/52 | Operation manual Z130-SE | 05/2016 9/52 | Operation manual Z130-SE | 05/2016...
  • Page 6: Carrying Persons/Passengers

    5. Never leave combine unsupervised as long as the engine is still run- ning! 6. Wait unit all attachments are stationary! • Attachments can run-on after switching off. Remain at a safe distance until the units are stationary. 10/52 | Operation manual Z130-SE | 05/2016 11/52 | Operation manual Z130-SE | 05/2016...
  • Page 7: Maintenance / Repair

    9. Lever reel speed 20. 12 Volt socket (2-pin) 10. Display emergency stop active 21. 12 Volt socket (3-pin) 11. Display warning hydraulic filter 22. Lever engine speed 12/52 | Operation manual Z130-SE | 05/2016 13/52 | Operation manual Z130-SE | 05/2016...
  • Page 8: Speed Display

    1. Raise header 5. Header on 2. Lower header 6. Header off 3. Raise reel 7. Reel forward (option) 4. Lower reel 8. Reel back (option) 14/52 | Operation manual Z130-SE | 05/2016 15/52 | Operation manual Z130-SE | 05/2016...
  • Page 9: Driving

    4. Operating hours counter 11. High beam headlights 5. Not used 12. Hazard warning indicators 6. Parking brake 13. Not used 7. Engine temperature 14. Fuel gauge 16/52 | Operation manual Z130-SE | 05/2016 17/52 | Operation manual Z130-SE | 05/2016...
  • Page 10: Steering Column Adjustment

    • Check free movement of the pulleys for the belt coupling. ing brake lever (Fig. 3.8) on the left side of • Check the adjustment of the header load relief springs. the driver’s cab. Fig. 3.8 18/52 | Operation manual Z130-SE | 05/2016 19/52 | Operation manual Z130-SE | 05/2016...
  • Page 11: Engine Operation

    1. Set engine to idle. 2. Shut down threshing system and grain tank discharge pipe. 3. Turn ignition switch until the combine is off. 4. Switch off main battery switch 20/52 | Operation manual Z130-SE | 05/2016 21/52 | Operation manual Z130-SE | 05/2016...
  • Page 12: Thresher Settings

    The speed of the threshing cylinder is set using the rocker switch on the dashboard (see 3.1 element 15). The speed set can be read on the speed display (see 3.2). 22/52 | Operation manual Z130-SE | 05/2016 23/52 | Operation manual Z130-SE | 05/2016...
  • Page 13: Setting Concave Spacing

    • The opening between the dust plate and upper sieve must be large enough that the chaff on the under sieve can wander to the rear. Fig. 7.5 24/52 | Operation manual Z130-SE | 05/2016 25/52 | Operation manual Z130-SE | 05/2016...
  • Page 14: Fitting Crop Divider

    2. Turn the reel until the reel prongs are in the required position. 3. Release the detent pin. 4. Ensure the detent pin locks in the segment with holes. Fig. 7.12 26/52 | Operation manual Z130-SE | 05/2016 27/52 | Operation manual Z130-SE | 05/2016...
  • Page 15: Adjusting Cross Feeding Auger

    4. Lower header. point The load relief springs must be adjusted such that the attachment can be lifted with a force of 50-80 kg. Fig. 7.21 28/52 | Operation manual Z130-SE | 05/2016 29/52 | Operation manual Z130-SE | 05/2016...
  • Page 16: Fitting Corn Header (Option)

    The grain tank discharge pipe is switched on and off using the “Grain tank discharge” switch (see 3.1 element 17). 7.12. Electronic weighing device (option) For operation and adjustment see separate operating manual “Weighing system DK800 - HMP2” 30/52 | Operation manual Z130-SE | 05/2016 31/52 | Operation manual Z130-SE | 05/2016...
  • Page 17: Cleaning

    Fig. 9.2 9.2. Blowing out header The header can be blown out using a switch (see 3.1 element 5) on the dashboard. Fig. 9.3 32/52 | Operation manual Z130-SE | 05/2016 33/52 | Operation manual Z130-SE | 05/2016...
  • Page 18: Maintenance Check List (Prior To Start Of Harvest) - Master For Copying

    32. Covers fitted in side wall (2x small, 2x large) 33. Threshing concave fastening checked 34. Table locking pins firmly fastened Undertaken by: 35. Table adjusting bolts firmly tightened (M10) 34/52 | Operation manual Z130-SE | 05/2016 35/52 | Operation manual Z130-SE | 05/2016...
  • Page 19: Tilting Driver Platform

    Amount Type oil change initial filling Engine oil John Deere PLUS-50 7.4l 7.4l Hydraulic oil John Deere Hy-Gard 10.4.2.2. Coolant Coolant John Deere Cool Gard II 36/52 | Operation manual Z130-SE | 05/2016 37/52 | Operation manual Z130-SE | 05/2016...
  • Page 20: Checking Hydraulic Oil Level / Topping Up

    2. Pull out hydraulic oil filter (Fig. 10.3) and place in a clean container. 3. Top-up oil. Fig. 10.5 4. Fit hydraulic oil filter. 5. Closed red cover. Fig. 10.3 Fig. 10.6 38/52 | Operation manual Z130-SE | 05/2016 39/52 | Operation manual Z130-SE | 05/2016...
  • Page 21: Maintaining Conveyor Belts

    Attention: Conveyor belts only reach the final tension after 2 min., for this rea- son do not tension excessively. 3. Tighten upper nut Fig. 10.11 Fig. 10.17 40/52 | Operation manual Z130-SE | 05/2016 41/52 | Operation manual Z130-SE | 05/2016...
  • Page 22: Tensioning Compressor Belt

    Nm. Attention: The markings must be in otherwise indentations may be a line. produced on the end caps on the hydraulic motors. Fig. 10.18 Fig. 10.20 Fig. 10.19 Fig. 10.21 42/52 | Operation manual Z130-SE | 05/2016 43/52 | Operation manual Z130-SE | 05/2016...
  • Page 23: Electrics

    15 A Working lights Alternator (B+) 15 A Weighing system (7-pin socket) Parking brake 15 A Air-conditioning compressor 15 A Relay switched positive Threshing system interlocking Grain tank level 44/52 | Operation manual Z130-SE | 05/2016 45/52 | Operation manual Z130-SE | 05/2016...
  • Page 24: Relay On The Printed Circuit Board

    Item Function Warning Blower Hydraulics header Brake Reel horizontal adjustment Start inhibit Potentiometer output Multifunction lever Header Hydraulics reel Reel up/down Header up/down Header on/off Fig. 11.3 46/52 | Operation manual Z130-SE | 05/2016 47/52 | Operation manual Z130-SE | 05/2016...
  • Page 25: Winterizing

    • Check belt running and higher • Remove rust from v-belt pulleys and clean • Clean oiled belts • Switch on threshing system at idle and only 48/52 | Operation manual Z130-SE | 05/2016 49/52 | Operation manual Z130-SE | 05/2016...
  • Page 26 • Check sieve case and shaker drive for wear 14.12. Steering • Shaker area 1.8 m and fracture • 3 active steps • Hydraulic steering 14.6. Cleaning • Continuously adjustable, hydraulically driven cleaning blower 50/52 | Operation manual Z130-SE | 05/2016 51/52 | Operation manual Z130-SE | 05/2016...
  • Page 27 • Rapeseed side cutting knife left and right with mechanical drive • Sunflower attachment 2/3-row • Sunroof • Working lights • Approval for use on public roads • Lights in accordance with road traffic regu- lations (StVZO) 52/52 | Operation manual Z130-SE | 05/2016...

Table of Contents