table of contents Contents General operation: .............................. 1 Features and Capabilities: ..........................1 Overview ................................2 Wiring .................................. 4 Power and Network connections: ........................4 Gain Setting ................................ 4 UPS connection: ............................. 6...
Page 3
IMPORTANT SAFETY INSTRUCTIONS RISK OF ELECTRIC SHOCK- DO NOT OPEN THE UNIT. THERE ARE NO SERVICABLE COMPONENTS INSIDE. Read these instructions. Keep these instructions. Heed all warnings. Follow all instructions. Do not use this apparatus near water. Clean only with dry cloth. Do not block any ventilation openings.
(3000 feet or more). Each router terminates and rebroadcasts paging, audio, and control network (LON) signals back to full strength allowing the system wiring network to work at best practices standards. The Smart Router will automatically bypass the music and page audio if the Smart Switch closes due to a broken data cable.
Overview Figure 1 – Front panel 5. Activity LON 1 LED 1. Power LED This LED indicates LON activity. The power LED indicates that the unit is powered. 6. Gain Switch The Gain adjustment is to be set based 2. Fault LEDs on the length of the Data cable.
Page 6
Figure 2 - Rear panel 3. Power IN (24VDC) 1. DATA IN/OUT This connector is used to connect an Connect the Data out port to the next external 24VDC UPS. OP. The Data in port receives the data cable from the previous OP. 4.
1. Plug the unit into a standard 115 or 208 VAC power outlet. 2. Connect the data cable from a previous OP DATA OUT to the Smart Router’s DATA IN port. Connect a cable from the router’s DATA OUT port to the next OP DATA IN connector.
Page 8
INPUT 1 A INPUT 1 B INPUT 2 A INPUT 2 B INPUT 3 A INPUT 3 B INPUT 4 A INPUT 4 B INPUT 5 A INPUT 5 B INPUT 6 A INPUT 6 B INPUT 7 A INPUT 7 B INPUT 8 A INPUT 8 B INPUT 9 A...
UPS Connection: The UPS output would connect to the terminal block: +24VDC to pin “+” and 24V COM to either pin “-“. The UPS must be 24VDC regulated until the power supply batteries are exhausted. Normal and alarm standby load is 75mA.
Page 10
Testing Procedure Equipment should only be tested by qualified trained personnel. These instructions are meant as a guide to what testing should take place; it is not an instruction on how to complete the testing. Refer to the Operations, Sound Manager, and Configurator manuals for detailed information. Testing should be performed monthly or more frequently if necessary.
Page 11
Maintenance Procedure Equipment should only be inspected and maintained by qualified trained personnel. These instructions are meant as a guide to what actions should take place; it is not an instruction on how to complete the activities. Maintenance should be performed monthly or more frequently if necessary. 1.
Need help?