Table of Contents

Advertisement

Quick Links

PCIE-6001
Installation and Use
P/N: 6806800U73B
December 2019

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PCIE-6001 and is the answer not in the manual?

Questions and answers

Summary of Contents for SMART PCIE-6001

  • Page 1 PCIE-6001 Installation and Use P/N: 6806800U73B December 2019...
  • Page 2 SMART EC shall not be liable for any special, indirect, incidental, or consequential damages, including without limitation, lost revenues or lost profits, which may result from the use of these materials. SMART EC may make changes to these materials, or to the products described therein, at any time without notice. SMART EC makes no commitment to update the information contained within these materials.
  • Page 3: Table Of Contents

    Unpacking and Inspecting PCIE-6001 Card ........
  • Page 4 Related Documentation ............45 B.1 SMART Embedded Computing Documentation ....... . . 45...
  • Page 5 PCIE-6001 Block Diagram ........
  • Page 6 List of Figures PCIE-6001 Installation and Use (6806800U73B)
  • Page 7 SMART EC Documentation ........
  • Page 8 List of Tables PCIE-6001 Installation and Use (6806800U73B)
  • Page 9: About This Manual

    PCIE-6001 card block diagram. Chapter 4, Controls, Indicators, and Connectors on page 37 provides information about the controls, indicators, connectors, and pin assignments associated with the PCIE-6001 card. Appendix A, PCIE-6001 Card Configuration Example on page 43 provides an example of how a PCIE-6001 card is configured in a MaxCore™...
  • Page 10 Omission of information from example/command that is not necessary at the time Ranges, for example: 0..4 means one of the integers 0,1,2,3, and 4 (used in registers) Logical OR Indicates a hazardous situation which, if not avoided, could result in death or serious injury PCIE-6001 Installation and Use (6806800U73B)
  • Page 11 No danger encountered, pay attention to important information Summary of Changes This manual has been revised and replaces all prior editions. Part Number Publication Date Description 6806800U73B December 2019 Rebrand to SMART Embedded Computing template 6806800U73A June 2017 Initial version PCIE-6001 Installation and Use (6806800U73B)
  • Page 12 About this Manual About this Manual PCIE-6001 Installation and Use (6806800U73B)
  • Page 13: Safety Notes

    Do not install substitute parts or perform any unauthorized modification of the equipment or the warranty may be voided. Contact your local SMART EC representative for service and repair to make sure that all safety features are maintained.
  • Page 14 Only use appropriate tools when installing/removing the product to avoid damage/deformation to the card and/or PCB. Environment Environmental Damage Always dispose equipment that is finally taken out of operation according to your country’s legislation and manufacturer’s instructions. PCIE-6001 Installation and Use (6806800U73B)
  • Page 15: Sicherheitshinweise

    Installieren Sie keine Ersatzteile oder führen Sie keine unerlaubten Veränderungen am Produkt durch, sonst verfällt die Garantie. Wenden Sie sich für Wartung oder Reparatur bitte an die für Sie zuständige Geschäftsstelle von SMART EC. So stellen Sie sicher, dass alle sicherheitsrelevanten Aspekte beachtet werden.
  • Page 16 Wahrscheinlichkeit zu starken Störungen führen, welche dann auf Kosten des Produktanwenders beseitigt werden müssen. Änderungen oder Modifikationen am Produkt, welche ohne ausdrückliche Genehmigung von SMART EC durchgeführt werden, können dazu führen, dass der Anwender die Genehmigung zum Betrieb des Produktes verliert.
  • Page 17 Verwenden Sie geeignetes Werkzeug, um das Produkt zu installieren/deinstallieren. Auf diese Weise vermeiden Sie, dass das card oder die Platine deformiert oder zerstört wirdUmweltschutz Umweltschäden Entsorgen Sie alte elektronische Baugruppen stets gemäß der in Ihrem Land gültigen Gesetzgebung und den Empfehlungen des Herstellers.. PCIE-6001 Installation and Use (6806800U73B)
  • Page 18 Sicherheitshinweise Sicherheitshinweise PCIE-6001 Installation and Use (6806800U73B)
  • Page 19: Introduction

    The PCIE-6001 leverages NVMe technology which is currently the fastest way to attach an SSD to a CPU. The PCIE-6001 is a carrier for COTS (commercial off-the-shelf) solid state drive modules with an M.2 form factor. M.2 modules are considered mainstream for data center and consumer markets, delivering outstanding size/price/performance ratio.
  • Page 20: Hardware Overview

    Introduction Hardware Overview The PCIE-6001 is a full height, full length PCIe expansion card that acts as additional storage exclusively for SMART EC MaxCore platforms. The following figure shows the mechanical layout and dimensions of the PCIE-6001 card. The M.2 socket labels are also shown on the card.
  • Page 21: Standard Compliances

    Surge The PCIE-6001 card is designed to comply only with the MaxCore server. Ordering and Support Information Refer to the data sheet for the PCIE-6001 for a complete list of available variants and accessories. Refer to Appendix B, Related Documentation or consult your local SMART Embedded Computing sales representative for the availability of other variants.
  • Page 22 Introduction Introduction PCIE-6001 Installation and Use (6806800U73B)
  • Page 23: Hardware Preparation And Installation

    The environmental, thermal, and power requirements, and the installation and removal procedures of the card are also explained in this chapter. Unpacking and Inspecting PCIE-6001 Card NOTICE Damage of Circuits Electrostatic discharge and incorrect installation and removal of the card can damage circuits or shorten their life.
  • Page 24: Environmental, Thermal, And Power Requirements

    Side View M2.5 shoulder screw M2.5 screw Standoff 2. Check your shipment and report any damage or differences via the SMART EC support page at https://www.smartembedded.com/ec/support/. 3. Remove the desiccant bag shipped with the card and dispose it according to your country’s legislation.
  • Page 25: Environmental And Thermal Requirements

    10 Min 0.01G (sinusoidal) 5 – 200Hz Vibration (transverse) 10 Min. 0.01G (sinusoidal) 5 – 200Hz Vibration (longitudinal) 10 Min. 0.01G (sinusoidal) 5 – 200Hz 1200 mm/all edges and Freefall corners (packed state) 100 mm/3 axis (unpacked) Altitude Sea level PCIE-6001 Installation and Use (6806800U73B)
  • Page 26: Power Requirements

    2.3.2 Power Requirements The PCIE-6001 payload card accepts single and double-sided modules up to a power consumption of 10W per module. The module interface must comply with the NVMe (NVM Express) standard. In case of MaxCore platforms, the MaxCore system reads the thermal sensors and provides sufficient cooling.
  • Page 27: Precautions

    Avoid moving as much as possible. Movement gathers static electricity around you.  Do not touch the solder point, pin, or bare circuit.  Do not leave the device in the place where others can operate it. PCIE-6001 Installation and Use (6806800U73B)
  • Page 28: Ahci Or Nvme Ssd Installation And Removal

    M.2 AHCI or NVMe SSD Installation on the PCIE-6001 Card PCIE-6001 provides four (4) sets of the hardware as shown in Figure 1-1. To install M.2 AHCI or NVMe SSD modules on a PCIE-6001 card: PCIE-6001 Installation and Use (6806800U73B)
  • Page 29 1. Install M2.5 screw and standoff in the PCB hole location based on the length of the M.2 module.. M2.5 screw Standoff screw 2. Install the M.2 module. 3. Install the M.2 shoulder screw. Torque should not exceed 0.1 Nm M2.5 shoulder screw PCIE-6001 Installation and Use (6806800U73B)
  • Page 30: M.2 Ahci Or Nvme Ssd Removal From The Pcie-6001 Card

    For detailed information about the PCIe card installation, refer to MaxCore product documentation. 4. Insert the PCIE-6001 card into the PCIe slot, secure it, and ensure that the card is properly fitted in the PCIe slot. PCIE-6001 Installation and Use (6806800U73B)
  • Page 31: Pcie-6001 Card Removal

    3. Remove the system cover. Wait at least 30 minutes for the card to cool down as the heat sink could be extremely hot. 4. Remove the screw holding the front panel bracket and gently pull the PCIE-6001 card from the slot. NOTICE Place the PCIE-6001 card into an ESD-protective bag and seal it appropriately.
  • Page 32 Hardware Preparation and Installation Hardware Preparation and Installation PCIE-6001 Installation and Use (6806800U73B)
  • Page 33: Functional Description

    The following figure depicts the functional block diagram of PCIE-6001 card. Figure 3-1 PCIE-6001 Block Diagram Power Both 3.3V and 12V power are provided to the PCIE-6001 through the PCIe gold fingers (through the +3.3V Aux and +12V rails respectfully). PCIE-6001 Installation and Use (6806800U73B)
  • Page 34: Cpld

    Additional Glue Logic M.2/NGFF Card Sockets The primary purpose of the PCIE-6001 is to extend the storage capabilities of the MaxCore chassis by providing four M.2/NGFF card sockets for solid state drives. PCIE-6001 supports all standard module sizes for Socket 3 (2242, 2260, 2280 and 22110) for both single and dual-sided modules (S1-S3 and D0-D5).
  • Page 35: Temperature Sensors

    Functional Description Temperature Sensors To ensure the board will operate at safe temperatures, the PCIE-6001 has a pair of LM75A temperature sensors (at the inlet and outlet) along with an ADT7461A which provides the internal PEX die temperature. These sensors cannot be directly accessed via the upstream host processor, but can be accessed via a CPLD register.
  • Page 36 Functional Description Functional Description PCIE-6001 Installation and Use (6806800U73B)
  • Page 37: Controls, Indicators, And Connectors

    The following figure shows the face plate view of PCIE-6001 card. Figure 4-1 PCIE-6001 Face Plate The PCIE-6001 card comes with two gold finger edge connectors referred as Edge Connector 1 and Edge Connector 2. PCIE-6001 Installation and Use (6806800U73B)
  • Page 38: M.2/Ngff Edge Card Socket J3-J6

    PCIe Receive Pair Ground NVME_R3_P PCIe Receive Pair Ground Ground Ground NVME_T2_N PCIe Transmit Pair Ground NVME_T2_P PCIe Transmit Pair No Connect Not connected Ground No Connect Not connected NVME_R2_N PCIe Receive Pair No Connect Not connected PCIE-6001 Installation and Use (6806800U73B)
  • Page 39 No Connect Not connected NVME_T0_P PCIe Transmit Pair No Connect Not connected Ground No Connect Not connected NVME_R0_N PCIe Receive Pair No Connect Not connected NVME_R0_P PCIe Receive Pair PERST_L PCIe Fundamental Reset (3.3V LVTTL) PCIE-6001 Installation and Use (6806800U73B)
  • Page 40 Not connected Ground No Connect Not connected Mechanical Key No Connect Not connected SUSCLK Suspend Clock No Connect Not connected +3.3V +3.3 Volt power Ground +3.3V +3.3 Volt power Ground +3.3V +3.3 Volt power Ground PCIE-6001 Installation and Use (6806800U73B)
  • Page 41: Leds

    Steady Red Drive is held in reset. Error. Blinking Green Drive activity NVMe 1 Steady Red Drive is held in reset. Error. Blinking Green Drive activity NVMe 2 Steady Red Drive is held in reset. Error. PCIE-6001 Installation and Use (6806800U73B)
  • Page 42: Table 4-2 Front Panel Leds

    PCI Express Gen 3 (8GT/s) Link No link Blinking Green, 2 Hz PCI Express Gen 1 (2.5GT/s) Link NVMe 3 Blinking Green, 1 Hz PCI Express Gen 2 (5GT/s) Link Steady Green PCI Express Gen 3 (8GT/s) Link PCIE-6001 Installation and Use (6806800U73B)
  • Page 43: Pcie-6001 Card Configuration Example

    PCIE-6001 Card Configuration Example Configuration Example This section provides information needed to configure M.2 AHCI or NVMe SSDs on a PCIE-6001 payload card to the CPUs on the host PCIe cards in the SMART Embedded Computing MaxCore™ system. A.1.1 SMART EC MaxCore System The System Services Framework (SSF) management system provides the MaxCore operator console.
  • Page 44 PCIE-6001 Card Configuration Example PCIE-6001 Card Configuration Example PCIE-6001 Installation and Use (6806800U73B)
  • Page 45: Related Documentation

    The documentation listed is referenced in this manual. Technical documentation can be found by using the Documentation Search at https://www.smartembedded.com/ec/support/ or you can obtain electronic copies of SMART EC documentation by contacting your local sales representative. Table B-1 SMART EC Documentation...
  • Page 48 © 2019 SMART Embedded Computing™, Inc. All Rights Reserved. The stylized “S” and “SMART” is a registered trademark of SMART Modular Technologies, Inc. and “SMART Embedded Computing” and the SMART Embedded Computing logo are trademarks of SMART Modular Technologies, Inc. All other names and logos...

Table of Contents