Mailbox Installation Instructions:
1.
Locate the area where the Mailbox will be placed.
2.
If the Bollard is not being mounted to existing concrete
or a permanent surface then a footer is needed.
3.
Dig a hole for the footer. Refer to the Table A below for
suggested footing size.
BOLLARD SIZE
Estate Series - 6x6x42"
C
42"
D
www.NightscapingUSA.com
®
IN THE USA
SINCE 1959
RECOMMENDED FOOTER
10" Diameter x 30" Deep
Figure C
30"
Figure D
•
835 Lincoln Ave #13, West Chester, PA 19380
Mailbox Bollard Installation Sheet
Table A
Concrete Footer
1/2" Electrical Conduit
25' Lead
Wire
4.
Place the 1/2" electrical conduit (shown in Figure B) into the
footer. The top of the electrical conduit should be sitting at least
1" above the top of the footer hole/ground level. The base of
the electrical conduit should exit into the ground. If using J-Bolts
flip to Page 2 now.
5.
Pour concrete around the 1/2" electrical conduit, filling the
footer. DO NOT FILL THE ELECTRICAL CONDUIT WITH CONCRETE.
Ensure that the concrete footer is level by using a Torpedo level.
Allow the concrete to cure for the recommended time
specified by the manufacturer.
6.
Once the concrete has cured, position the Universal Mounting
Plate (UMP) onto the concrete footer in the desired position.
Mark your pilot holes for the wedge anchor bolts (provided). If
using J-bolts please see J-bolt installation instructions (Page 2).
7.
Using a carbide tipped 3/8" drill bit (sold seperately), drill pilot
holes in the marked locations. After the pilot holes have been
drilled, insert the wedge anchor bolts (use hammer to secure).
8.
Place the UMP over the anchor bolts. Once it is located in the
desired position tighten the nuts until the UMP is securely
fastened to the footer. Make sure to raise the Bollard about
1/2" above the ground level using the provided nuts and bolts.
Not following these instructions will void all warranties.
9.
Run the lead wire from the luminaire through the 1/2" electrical
conduit and connect it to the power supply line using lithium
grease filled wire nuts.
10.
Place the Base Cover Plate over the Bollard then slide the
Bollard over the UMP (shown in Figure D). Check to make sure
that the Bollard is level and securely fasten the Bollard to the
UMP using the screws provided.
Install the Mailbox Topper shown in Figure C. See page 4 for
11.
more details on installation of the mailbox and address plate.
CorTen Steel Mailbox Bollard Light
Mailbox Series Bollards
24" Service
Wire Lead
•
info@nightscapingusa.com
Bollard Tube
Universal Mounting
Plate
Base Plate
Cover
Figure B