Preparation

UNEVEN FLOORS AND WALLS

Because floors and walls have uneven spots which
will affect the installation, it will be necessary to locate
these uneven areas. Wall and floor unevenness can
cause cabinets to be misaligned resulting in "racking"
or misalignment of the doors and drawer fronts. Uneven
spots can be found with a straight edge or a 4 ft. level.
Simply run the straight edge along the floor and wall to
identify any uneven areas. Where these uneven spots
interfere, high spots can be removed by scraping or
sanding the excess plaster. Low spots can be shimmed.

LOCATE STUDS

Locate the wall studs with a stud finder or tap on the wall
to locate a "solid sound". This generally will tell you where
the wall studs are located. You can verify this location by
driving a small finishing nail into the wall. Make sure this
is an area that will be covered by the base cabinets. Mark
a chalk line at the center of the wall studs at the top and
bottom of the cabinet position. Normally the wall studs
are located 16 in. apart, center to center.

CABINET INSTALLATION

Please read prior to installation.

CABINET HEIGHT

To establish the height of your base cabinets, measure up
and mark the wall at 33
floor. Use this mark as a starting point and draw the lines
around the bathroom. Mark the outlines of all cabinets on
the wall to check actual cabinet dimensions against your
layout (Figure 1).

HARDWARE

Decorative and installation hardware such as nails, screws,
glue, wire, tape, etc., are not included.

INSTALLATION TIP

Whenever drilling into a cabinet frame, crown, back panel,
wall cleat, etc., it is recommended to pre-drill a pilot hole
first to help prevent splitting. Also, using a little wax on the
screws will help seat them into the wood.
Tack in shims at
low points.
in. from the highest spot on the
1
2
Mark the outlines of
all cabinet sizes on the
81 in.
wall to check the actual
cabinet dimensions
against your layout.
33½ in.
Strike level baseline from
highest point of floor.
U180652
Rev. 2-19
Figure 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Villa Bath and is the answer not in the manual?

Questions and answers

Summary of Contents for RSI Villa Bath

  • Page 1 CABINET INSTALLATION U180652 Rev. 2-19 Please read prior to installation. Preparation UNEVEN FLOORS AND WALLS CABINET HEIGHT Because floors and walls have uneven spots which To establish the height of your base cabinets, measure up will affect the installation, it will be necessary to locate and mark the wall at 33 ⁄...
  • Page 2 INSTALL BASE CABINETS Block Before beginning the cabinet installation, you will need to apply the finished flush-fit end panel(s) to the side(s) of the Wall Shims cabinet(s) that will be exposed to the room. Refer to the Filler instructions provided with the flush fit end panels. Block When starting the installation process, it is very important to start your installation from a corner wall and work out.
  • Page 3 Hinge Adjustment It usually is necessary to adjust your hinges once you have finished the installation of your cabinets (Figure 6). You must do this before Loosen screw installing any decorative hardware. for adjustment of door up and down Drawer Adjustment DRAWER GLIDES Loosen screw for adjustment of door...
  • Page 4 Decorative Foot Installation Before installing decorative foot, you will need to install the standard ⁄ in. finished toe kick (see Toe Kick Installation). When installing the decorative foot it will be necessary to remove the doors or drawers from the base cabinets or drawer banks. a) When installing a foot under a filler, apply double-sided tape and adhesive to the back side of foot to secure in place.
  • Page 5 Floor Hutch The floor hutch is assembled with the finished flush-fit end panels unattached. You will need to apply the flush-fit end panels to the side(s) of the cabinet that will be exposed to the room. Just follow the simple steps below. Flush-Fit End Panel MATERIALS Finished flush-fit end panel and a roll of double-sided tape...
  • Page 6 What RSI Home Products Will Do Under The Warranty: conditions, humidity absorption, or mold. In addition, variations in During the warranty period, RSI, at it’s option, will repair or replace wood grain, finish color, aging or other natural wood and stain...

Table of Contents