Do you have a question about the STI BV and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for IMI STI BV
Page 1
BV - BIG VOLUME BOOSTER INSTRUCTION MANUAL 2071...
Page 2
STI S.r.l has taken every care in collecting and verifying the documentation contained in this Instruction Manual. The information herein contained are reserved property of STI S.r.l. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
UBRICATION PARTS LIST GENERAL ASSEMBLY ....................18 ..........................18 ASSEMBLY TROUBLESHOOTING ........................19 SPARE PARTS ..........................19 DECOMMISSIONING ........................20 ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 4
____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
24040 Levate (BG) Italy Tel. +39 035 2928.2 Fax +39 035 2928.247 imisti.sales@imi-critical.com 1.4 Terms and conditions STI S.r.l. guarantees each single product to be free from defects and to conform to current goods specifications. The warranty period is one year from the date of installation by the first user, or eighteen months from the date of shipment to the first user, whichever occurs first.
(with protective wear wear a helmet. protect the protect your the possible clothing. protective eyes. hearing. supplementary footwear. signboard) ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
It is forbidden to modify the information and the marks without previous written authorization by STI S.r.l. Figure 2 – label ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
5.6 and 5.7. 5.5 Documents and dimensional drawings Pneumatic diagrams, wiring diagrams and dimensional drawings are furnished with document accompanying the actuator. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Make the connections according to the operating diagram. Check the absence of leakages from pneumatic connections. If necessary, tighten the nuts of the pipe-fittings. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
BV. Cylinder chambers, pipe fittings and accessories must not be under pressure. The staff must be qualified for the required operation. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
In this case the upper shutter generates the greatest flow section available because the piston reaches its upper stroke limit. This case is called “on-off mode” (figure 9). ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 13
Valve shutter PILOT Piston Upper shutter ACTUATOR Lower shutter Figure 4 – charge setup: stand-by mode ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 14
Valve shutter PILOT Piston Upper shutter ACTUATOR Lower shutter PRESSURE LINE Figure 5 – charge setup: modulating mode ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 15
Valve shutter PILOT Piston Upper shutter ACTUATOR Lower shutter PRESSURE LINE Figure 6 - charge setup: on-off mode ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 16
Valve shutter PILOT Piston Upper shutter ACTUATOR Lower shutter Figure 7 – discharge setup: stand-by mode ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 17
Valve shutter PILOT Piston Upper shutter ACTUATOR Lower shutter ENVIRONMENT Figure 8 – discharge setup: modulating mode ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 18
Valve shutter PILOT Piston Upper shutter ACTUATOR Lower shutter ENVIRONMENT Figure 9 - discharge setup: on-off mode ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
It is severely forbidden to use the BV under conditions other than those provided on the label. The label fastened on the BV contains the main BV operating conditions for the specified application. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Worked penetration (1/10mm): 295 ASTM D-2265 Dropping Point: 200°C ASTM D-2265 Dropping Point: 260°C Important BV does not need lubrication during his life. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Flange bearing Sealing ring OR 3125 Sealing ring OR 2081 Stop ring Smalley spring Smalley spring Figure 10 – BV assembly ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Repairs must not be carried out. When needed send back to STI S.r.l the device for any repairing and final test. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
The demolition of BV parts should be made from specialized personnel. Important In all cases check local authority regulation before disposal. ____________________________________________________________________________________ STI S.r.l. – Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com Manual 2071, rev.07 02/2019 – BV...
Page 25
IMI STI - Headquarters Via Dei Caravaggi 15 24040 Levate (BG) Italy Tel. +39 035 2928.2 Fax +39 035 2928.247 IMI STI – Quarter Turn Division Via San Francesco 18 29017 Fiorenzuola d’Arda (PC) Italy Tel. +39 035 2928.2 Fax +39 0523 1715.295...
Need help?
Do you have a question about the STI BV and is the answer not in the manual?
Questions and answers