MARLO NXT2 Series Installation, Operation And Maintenance Manual page 2

Commercial water conditioner
Table of Contents

Advertisement

MGT 45M – 450M 1-1/2" SINGLE NXT2
PRIOR TO
Media Loading
SIDE
VIEW
IMPORTANT PLEASE READ:
Warranty of this product extends to manufacturing defects.
The information, specifications and illustrations in this manual are based on the latest information
available at the time of printing. The manufacturer reserves the right to make changes at any time
without notice.
This product should be installed by a plumbing professional on potable water systems only.
This product must be installed in compliance with all local and state and municipal plumbing and
electrical codes. Permits may be required at the time of installation.
Inspection Requirement
Prior to Loading Media
1. Inspect condition of upper distributor piping. Verify
fittings are tight and positioned as shown.
2. Inspect condition of strainers, laterals and hub through
top or side access ports. Verify fittings are secured
to hub.
3. DO NOT load media if damaged components are
observed. Contact factory.
4. Installer is responsible for media loss into treated water
resulting from failure to report and repair damaged
components inside media tank prior to media loading.
5. INSTALLER WARNING:
Refer to installation instructions for media loading
procedure. Improper loading of media will damage
components inside media tank.
Media Tank
Lateral
Hub
Distributor Tube
Hub
Lateral
Softener/
Media Tank
Filter Media
TOP
VIEW
Gravel
Media
AFTER
Media Loading
5-272

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgt 45mMgt 450mMgt 60mMgt 90mMgt 120mMgt 150m ... Show all

Table of Contents