Trouble Shooting And Service; Charging Indicators - Primepower chAmp Series Manual

Table of Contents

Advertisement

Available languages

Available languages

CHAMP SERIES 12/17 - 24/12 – 24/8 - 12/30 -24/20 MANUAL

TROUBLE SHOOTING AND SERVICE

Yellow
Yellow

CHARGING INDICATORS

DIODE
The charger is equipped with a temperature measurement device. The charging voltage level will adopt to the
correct value according to the ambient temperature. The compensation is 0.2V / 10 degrees (default 25 degrees)
Red/green
Low battery voltage or no battery connected
Battery temperature > 50
Time error (timeout), the battery is probably to big for the charger
Faulty connected battery polarity
EXPLANATION
Yellow lower LED
Yellow middle LED
Green LED
Explanation
o
C
The charging process will start with max power – I Phase.
The current will drop as the battery is recharged. The
charging time is determined by the battery size and the
degree of discharge.
When the threshold value (BR) is reached, the internal timer
will start the U" phase of the charging process. The U2
phase keeps the charger in the higher charging voltage
(14,4V/28,8V) in 4 hours. This ensures recharge and
equalize the charge in all battery cells. This action also
prevents sulfating of the battery.
Maintenance charge, the voltage drops to 13,7V (27,5V).
This loading phase keeps the battery fully charged and the
charger can be left switched on in this position over time.
Possible parallel load or consumption is supplied from the
charger and the battery is kept fully charged. The battery
charger can provide full power in this phase.
Idavägen 11 SE-352 46
|
+46 470 72 74 95
EVENT
|
support@primepower.se
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents