INDEX OF CONTENTS SAFETY INFORMATION POSITIONING TRANSPORT | UNLOADING | UNPACKING IRONER POSITIONING RECOMMENDED CLEARANCE AROUND THE IRONER REMOVING THE TRANSPORT SAFETIES REMOVING THE ANTIOXIDANT PAPER CONNECTIONS TECHNICAL DATA CONNECTIONS SCHEME G 14.25 G 15.35 G 18.35 G 21.35 G 21.50 G 26.35 G 26.50 G 32.50...
SAFETY INFORMATION DANGER! Informs of a dangerous situation that, if not avoided, will cause death or severe body injury. WARNING! Informs of a dangerous situation that, if not avoided, will cause severe body injury or damage to property. CAUTION! Informs of a dangerous situation that, if not avoided, will cause minor body injury or damage to property. IMPORTANT! Informs of a procedure that, if not respected, will cause damage to appliance.
Page 4
WARNING! Failure to install, maintain, and/or operate the ironer according to the manufacturer’s instructions may result in conditions which can produce body injury and/or property damage. WARNING! For your safety and to reduce the risk of fire or explosions, do not store or use flammable substances or substances that can generate flammable vapours and in proximity of this appliance.
TECHNICAL DATA Model G 14.25 G 15.35 G 18.35 G 21.35 G 26.35 Roller Ø 270 mm 325 mm 325 mm 325 mm 325 mm Roller length 1450 mm 1480 mm 1800 mm 2100 mm 2580 mm Ironing speed 0,8÷3 m/min 1,6÷5 m/min 1,6÷5 m/min 1,6÷5 m/min 1,6÷5 m/ Hourly production 25 kg...
TRANSPORT | UNLOADING | UNPACKING INSPECTION When ironer is delivered, visually inspect the packing and the parts of the ironer visible through the packing. Before signing any delivery document to the forwarder, make sure the product is delivered intact. UNLOADING The ironer must be unloaded from truck and transported keeping forklift forks as wide apart as possible to avoid any torsion to the frame.
IRONER POSITIONING CAUTION! All operations must be carried out by fully qualified engineers. DANGER! Make sure that the floor static load limit complies with the equipment weight before positioning the ironer. IMPORTANT! To avoid damaging the appliance, do not let it drop when handling. G .25 and G .35 Open the doors using the key provided and remove the screws fixing the ironer to the pallet.
RECOMMENDED CLEARANCE AROUND THE IRONER For a correct use and operation it is recommended to leave free space around the ironer. Model Right Left Rear G 14.25 50 cm 50 cm 50 cm G 15.35 50 cm 50 cm 50 cm G 18.35 50 cm 50 cm...
REMOVING THE TRANSPORT SAFETIES CAUTION! All operations must be carried out by fully qualified engineers. Before connecting the ironer, it is necessary to remove the safeties installed to protect the machine from damages that might occur during the transport. G .25 and G .35 G .50 G Line - INSTALLATION MANUAL...
Page 10
Remove the belts sustaining the cylinder weight, on both sides. Remove the screw that fix the transport safeties to the panels and remove the safeties. Repeat the operation on both sides. DO NOT DISCARD THE SCREWS. G Line - INSTALLATION MANUAL...
Page 11
Remove the transport safeties. Install the centering teflon guides (2 pcs) that come with the machine. The set is packed inside the left side panel. Fix the centering guides using the screws removed before. G Line - INSTALLATION MANUAL...
REMOVING THE ANTIOXIDANT PAPER (models with polished cylinder only) The ironing cylinder is protected from oxidation effects by an anti-oxidation paper that MUST be removed on the first installation. Don’t discard the protective paper: wrap it on the ironing cylinder again in case of a prolonged inactivity of the machine ( ~ more than 1 week).
Page 13
STEP 3: Complete the operation making sure that the detaching linen springs and and the brass plates supporting the thermostat sensors are perfectly in contact with the cylinder. DETACHING LINEN SPRING BRASS PLATE WARNING! Disconnect the handwheel before starting the ironer. IMPORTANT! Do not tear the paper, and make sure no piece of paper remains inside the ironer when heating is activated.
CONNECTIONS SCHEME G 14.25 2022 2022 G Line - INSTALLATION MANUAL...
Page 15
LEGEND Letter Correspondence Notes Steam output Ø78 mm, 280 m³/h Fumes output Gas heated models only Ø80 mm, 100 m³/h Electricity connection PG21 Gas connection Gas heated models only G 1/2” M Table 2A G Line - INSTALLATION MANUAL...
Page 16
CONNECTIONS SCHEME G 15.35 2022 2022 G Line - INSTALLATION MANUAL...
Page 17
LEGEND Letter Correspondence Notes Steam output Ø80 mm, 280 m³/h Fumes output Gas heated models only Ø100 mm, 140 m³/h Electricity connection PG21 Gas connection Gas heated models only G 1/2” M Steam connection Steam heated models only 3/4” M Condensate exit Steam heated models only 3/8”...
Page 18
CONNECTIONS SCHEME G 18.35 2352 2352 G Line - INSTALLATION MANUAL...
Page 19
LEGEND Letter Correspondence Notes Steam output Ø80 mm, 280 m³/h Fumes output Gas heated models only Ø100 mm, 140 m³/h Electricity connection PG21 Gas connection Gas heated models only G 1/2” M Steam connection Steam heated models only 3/4” M Condensate exit Steam heated models only 3/8”...
Page 20
CONNECTIONS SCHEME G 21.35 2752 2752 G Line - INSTALLATION MANUAL...
Page 21
LEGEND Letter Correspondence Notes Steam output Ø80 mm, 280 m³/h Fumes output Gas heated models only Ø100 mm, 140 m³/h Electricity connection PG21 Gas connection Gas heated models only G 1/2” M Steam connection Steam heated models only 3/4” M Condensate exit Steam heated models only 3/8”...
Page 22
CONNECTIONS SCHEME G 26.35 3152 3152 G Line - INSTALLATION MANUAL...
Page 23
LEGEND Letter Correspondence Notes Steam output Ø80 mm, 280 m³/h Fumes output Gas heated models only Ø100 mm, 140 m³/h Electricity connection PG21 Gas connection Gas heated models only G 1/2” M Steam connection Steam heated models only 3/4” M Condensate exit Steam heated models only 3/8”...
Page 24
CONNECTIONS SCHEME G 21.50 2893 3288 149,5 364,5 1097 2893 G Line - INSTALLATION MANUAL...
Page 25
1166 LEGEND Letter Correspondence Notes Steam output 2 x Ø100 mm, 740 m³/h Fumes output Gas heated models only Ø120 mm, 1200 m³/h Electricity connection Gas and steam heated models PG13.5 Electric heated models PG36 Gas connection Gas heated models only G 1”...
Page 26
CONNECTIONS SCHEME G 26.50 3288 1294 3288 G Line - INSTALLATION MANUAL...
Page 27
1166 LEGEND Letter Correspondence Notes Steam output 2 x Ø100 mm, 740 m³/h Fumes output Gas heated models only Ø120 mm, 1200 m³/h Electricity connection Gas and steam heated models PG13.5 Electric heated models PG36 Gas connection Gas heated models only G 1”...
Page 28
CONNECTIONS SCHEME G 32.50 3873 1073 1587 3873 G Line - INSTALLATION MANUAL...
Page 29
1166 LEGEND Letter Correspondence Notes Steam output 2 x Ø100 mm, 740 m³/h Fumes output Gas heated models only Ø120 mm, 1200 m³/h Electricity connection Gas and steam heated models PG13.5 Electric heated models PG36 Gas connection Gas heated models only G 1”...
ELECTRICAL CONNECTIONS DANGER! Electrical connections must be carried out by fully qualified engineers. DANGER! When the main switch mounted on the ironer is in position 0, there is still tension on the ironer supply terminals. Turn off the ciruit breaker before carrying out any operation on the electric circuit. The manufacturer cannot be held responsible should safety regulations not be observed.
ELECTRICAL SPECIFICATIONS DANGER! Electrical connections must be carried out by fully qualified engineers. IMPORTANT! Circuit connection and protection must be realized in conformity with regional electrical regulations. Electrical specifications in Table 3 are subject to change without notice. Refer to product serial plate for most updated specifications of product being installed. G 14.25 HEATING Voltage...
Page 32
G 21.35 HEATING Voltage Wire size Circuit Breaker Absorption Electric Power TYPE Heaters Motors GAS/STEAM V.230/1/50-60Hz 10 A 1,2/1 kW 3 x 2.5 mm² (1Ph + N + ELECTRIC V.230/3/50-60Hz 63 A 62 A 23,4 kW 1 kW 4 x 16 mm² (3Ph + V.400/3N/50-60Hz 5 x 10 mm²...
Page 33
G 26.50 HEATING Voltage Wire size Circuit Breaker Absorption Electric Power TYPE Heaters Motors GAS/STEAM V.230/3/50-60Hz 10 A 2,7/1, 6 kW 4 x 2.5 mm² (3Ph + V.400/3N/50-60Hz 5 x 2.5 mm² (3Ph + N + 2, 7 /1, 6 kW V.400/3/50-60Hz 2,7/1, 6 kW 4 x 2.5 mm²...
ROOM CHARACTERISTICS WARNING! All operations must be carried out by fully qualified engineers. The ironer must be positioned in a well illuminated room, and ideally work in a temperature included between -10°C and +40°C. VENTILATION The ironer should be only installed in a well ventilated room. Ventilation air intake must comply with the norms in force in the destination country.
EXHAUST REQUIREMENTS WARNING! All operations must be carried out by fully qualified engineers. DANGER! All the ironer exhausts must be conveyed to the outdoors. Fresh air intake must be granted in accordance with national legal requirements. The exhaust piping must be properly insulated and always be realized in conformity with national legal norms. The chimney has to be adequately spaced from combustible and/or easily burning materials by air interspace or opportune insulating material.
GAS CONNECTION (gas heated models only) DANGER! All operations must be carried out by fully qualified engineers. Gas connection must be realized in conformity with national legal requirements. DANGER! For YOUR SAFETY and to reduce explosion and fire risks IF YOU SMELL GAS: - Close gas-tap - Open the windows - Do not absolutely touch any electrical component...
CHECKING THE GAS PRESSURE DANGER! All operations must be carried out by fully qualified engineers. Gas connection must be realized in conformity with national legal requirements. WARNING! Make sure the supply pressure is stable and corresponds to the data indicated in the serial number dataplate before lea- ving the site.
Order the original conversion kit from the factory. DANGER! To avoid risk of fire and explosion, ONLY use GMP original parts. IMPORTANT! On models G 21.35, G 26.35 and G.50, both nozzles must be changed (right and left hand side).
Page 41
STEP 2: Change gas pressure setting. Refer to dataplate coming with the conversion kit for the new supply/nozzle pressure to be set. Follow the procedure described in the paragraphs “Checking the pressure”, “Supply pressure” and “Nozzle pres- sure” to adjust the new working pressure required. IMPORTANT! On models G 21.35, G 26.35 and G.50, both nozzles and solenoid valves must be regulated (right and left hand side).
Page 42
-> DANGER! After having completed the connection check the absence of gas leaks: Sprinkle union, connection, inlet and outlet pipes with a solution of water and soap. Switch on the machine. Soap bubbles indicate a gas leak. Eliminate the gas leak. Before switching off the appliance, carry out a complete work session to ensure that the burner components work properly.
Page 43
STEAM SPECIFICATIONS (steam heated models only) Correspondence G 14.25 G 15.35 G 18.35 G 21.35 G 26.35 Steam consumption 19 kg/h 22 kg/h 26 kg/h 32 kg/h Minimum steam pressure required 4 bar 4 bar 4 bar 4 bar Table 8 Correspondence G 21.50 G 26.50...
STEAM CONNECTION (steam heated models only) DANGER! All operations must be carried out by fully qualified engineers. Steam connection must be realized in conformity with national legal requirements. The manufacturer cannot be held responsible should these regulations not be observed. RECOMMENDED STEAM CONNECTION SYSTEM STEAM CONNECTION A manual shut-off valve, a filter, a pressure regulator and a pressure gauge in the steam input line should be installed.
Need help?
Do you have a question about the G Series and is the answer not in the manual?
Questions and answers