Advertisement

Quick Links

Cantilever sliding gates
Bekamatic SC
6000 Line
Installation
Manual
Bekamatic SC
pg. 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bekamatic SC 6000 Line and is the answer not in the manual?

Questions and answers

Summary of Contents for Betafence Bekamatic SC 6000 Line

  • Page 1 Cantilever sliding gates Bekamatic SC 6000 Line Installation Manual Bekamatic SC pg. 1...
  • Page 2: Table Of Contents

    Table of Contents. Warnings ........................... 3 1.1. Warnings for installer and end user .................. 3 1.2. Special points to note ......................3 1.3. Safety rules for end user ....................... 5 Guidelines for installation ....................5 Guidelines for gate lifting ....................6 Foundations ..........................
  • Page 3: Warnings

    This gate should only be used for that what it has been expressly designed for (the complete system). Any other use breaching this, should be considered improper and therefore dangerous. Betafence cannot be held responsible for eventual damage caused by improper, incorrect and unreasonable use.
  • Page 4 hazards and obstacles. Do not try to stop the gate manually once in motion, this can lead to damage or serious injury. Please note that the gate can generate a considerable force during operation, which could be a source of danger. Do not move into the operating area of the gate during motion.
  • Page 5: Safety Rules For End User

    Under the yearly maintenance it is understood that the maintenance that is described by the manufacturer has been followed. If a maintenance contract between the customer and Betafence exists, Betafence will carry of this maintenance in cooperation with the user.
  • Page 6: Guidelines For Gate Lifting

    • The connection to the electrical power supply must be carried out by a qualified technician and in accordance with the regulations and standards that are applicable in the country of installation. Guidelines for gate lifting • Gates are delivered to the construction site completely assembled.
  • Page 7 Warning: THE FOUNDATION PLANS PROVIDED ON THE FOLLOWING PAGES SERVE ONLY AS AN EXAMPLE! ALWAYS USE THE PLANS PROVIDED WITH THE ORDER DOCUMENT. Concrete quality: C25 = cubic pressure resistance 25 N/mm 2 . • Bekamatic SC pg. 7...
  • Page 8: Gates Opening To The Right

    4.1. Gates opening to the right Bekamatic SC pg. 8...
  • Page 9: Gates Opening To The Left

    4.2. Gates opening to the left Bekamatic SC pg. 9...
  • Page 10: Preparations Before Gate Installation

    Preparations before gate installation: 5.1. Fixing requirements • Chemical anchors M16 x 250 mm with “Fender” type washers (minimum 125 mm anchor depth and minimum 100 mm above finished Ground Level). • For the mounting and securing of: Guiding post (4 anchors) Lock post (4 anchors) Rear guiding roller set (4 anchors) •...
  • Page 11: Preparing Installation Levels

    Drill the corresponding holes for the fixation of the chemical anchors according to the supplier’s installation instructions. Drilled holes must be vertical. Remove any dust and small particles from the drill holes using a brush and hand pump. This will ensure perfect adhesion between the resin, ground anchor and the concrete foundation.
  • Page 12: Installation Of The Gate Onto The Ground Anchors

    Installation of the gate onto the ground anchors: Important: Ensure your electrical cables have been passed through the cable pipes that are provided in the concrete. This enables an easier installation of the cables into the main guide post. The cables should protrude at least 1500mm above the concrete. Once this has been established the installation of the gate can begin.
  • Page 13: Installation Of The Lock Post Onto The Ground Anchors

    ATTENTION! Ensure that cables and wires are not crushed between surfaces while lowering and positioning the gate onto the ground anchors. Installation of the lock post onto the ground anchors: 1) Remove the lock post from the gate wing and suspend it over its ground anchors.
  • Page 14 3) Close the gate almost completely by hand and align the lock post. Make sure that the guiding rollers on top of the wing enter the catcher centrally. If excessive force is being exerted onto one of the catcher sides, then the set-up is not acceptable (this indicates misalignment).
  • Page 15 Correct adjustment of this roller is crucial for the correct functioning of the gate. Do not adjust the tensioning system Support Roller Rear Roller Front Roller Assembly Assembly Main Guide Post 9) The roller must be adjusted in height but also, it’s perpendicularity in relation to the under beam of the wing.
  • Page 16: Adjustment Of The Mechanical End Stops

    Remarks: 0° It’s very important to fill the space under the plate of the Guiding and lock post < 90° with shrinkage-compensated concrete. Adjustment of the mechanical end stops: ATTENTION! The verification and/or the adjustment of the mechanical end buffering must always be carried out.
  • Page 17: Adjustment Of The Rear Mechanical End Buffer

    5) Refit the safety pressure strip into the aluminum profile. To aid this, spray some silicone lubricant onto the rubber profile on the rear of the strip and push it into place. 9.2. Adjustment of the rear mechanical end buffer: The rear mechanical end buffer is an integral part of the rear roller assembly and is adjustable in length up to 450mm maximum (Exception: for gates up to 4000mm the adjustable length is up to 200mm...
  • Page 18: Motor Height Adjustment

    10. Motor height Adjustment: 1) Place the wing into the position where it is being supported by both the front and rear roller assemblies. 2) Turn the red sling anti-clockwise to engage the motor and gearbox. 3) Adjust the height of the pinion by turning the M12 nut allowing the spring to raise the drive assembly upwards.
  • Page 19 4) The height of the dental wheel is very important and in combination with a correctly levelled wing ensures a trouble-free operation (See set up Menu 8 Para 4). The normal rule is 1.5 mm space between dental wheel and dental rack.
  • Page 20: Set-Up Of The End Position

    11. Set-up of the end position: Limit switch Detection block Only active, if no 1) Fully open the gate and move the detection block on Limit switch is the dental rack in front of the sensor for open. You will activated.
  • Page 21: Adjustment And Testing Of Safety Equipment

    Switch the current on by turning the main switch position to “ON”. Main switch WARNING: THE CABLE DIAMETER CALCULATIONS ARE BASED ON OUR GATE WITH ALL OUR POSSIBLE ACCESSORIES. IF YOU ARE CONNECTING MORE CONSUMERS TO IT, IT MAY BE NECESSARY TO USE A BIGGER CROSS- SECTION.
  • Page 22 Below the technical specifications: Receiver Transmitter Important: To assure correct work of this system, is To ensure a correct function of the system, the batteries better that you change every year the must be renewed on a yearly basis. batteries. Bekamatic SC pg.
  • Page 23: Safety Strips

    13.2. Safety strips: Wiring diagram for the safety edges fitted to the guiding post is presented below: Check if all safety strips are functioning Four safety strips are connected to CN60E module. CN60E is connected to the “safety” input on the control board (input 5). 13.3.
  • Page 24 13.4. Remote controls: 13.4.1. Programming Remote control devices to the board: The gate controller has a two-channel receiver integrated into the board. You can only program one transmitter with the receiver using this direct method. To activate the receiver for Channel 1 push and hold button +/R1 for >...
  • Page 25: Different Set-Up Systems

    Take the transmitter which is to be programmed and hold it together (head to head) with the Master transmitter which is already in programming mode (see diagram below). Push the programmed button on the Master and simultaneous the button to be programmed on the second transmitter. When the LED on the Master stays on, release both buttons.
  • Page 26: Start The Self-Learning Procedure

    14.2. Start the Self-Learning procedure ATTENTION! DURING SET UP ALL SAFETY DEVICES ARE DISABLED! THEREFORE, ONLY CARRY OUT THE OPERATION WHEN NO TRAFFIC IS IN THE WING MOVEMENT AREA. If a system without an encoder is installed, mechanical stops are required for the wings.
  • Page 27: Maintenance

    Tel. +46 (0)302 356 25 oferty@betafence.com Fax: +39 0861 780222 (Plant) Fax. +46 (0)302 367 25 https://www.betafence.pl/pl info.italy@betafence.com info.nordic@betafence.com www.betafence.it Betafence s.r.o. – Czech Republic Betafence Türkiye Betafence Hrvatska Zvonařka 408/16 Dünya Ticaret Merkezi B1 Samoborska cesta 106 CZ-617 00 Brno T-11363 Yesilköy Istanbul HR - 10000 Zagreb Tel.: +420 548 210 431...
  • Page 28 This Manual is made on 13/05/2019 Bekamatic SC pg. 28 [H ie r eingeben] [H ier eingeben] [H ier eingeben]...

Table of Contents