RDI Titan Pro Rail STAIR RAIL Instructions

Advertisement

RAILING DYNAMICS, INC.
FOR hOMe, FOR LIFe™
135 STeeLmAnvILLe RoAd
egg HARboR TownSHIp, nJ 08234
TeL: (877) 420-7245
FAx: (866) 277-5160
e-mAIL: cS@RdIRAIL.com
URL: www.RdIRAIL.com
STAIR RAIL
INSTRUCTIONS
NOTE: Check with your local building code office for design load requirements for
guard rails and bottom space requirements. All supporting structures should be built
in accordance with applicable building codes.
1.
prepare all posts and mounting surfaces
before installation.
2.
Temporarily secure a plank on the noses
of the stairs between the posts onto
which you are installing the stair rail.
(Fig. 1) The thickness of the plank will
determine the space between the stairs
and the bottom rail.
place the bottom rail, baluster routs
facing up, on the plank with the label
reading "This end top of stair." at the
top post. Slide the rail up or down until
the rout spacing is even on each end
(Fig. 2).
make a mark on each post to indicate
the upper surface of the bottom rail (Fig.
3).
(Fig. 1)
(Fig. 2)
(Fig. 3)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Titan Pro Rail STAIR RAIL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RDI Titan Pro Rail STAIR RAIL

  • Page 1 RAILING DYNAMICS, INC. FOR hOMe, FOR LIFe™ 135 STeeLmAnvILLe RoAd egg HARboR TownSHIp, nJ 08234 TeL: (877) 420-7245 FAx: (866) 277-5160 e-mAIL: cS@RdIRAIL.com URL: www.RdIRAIL.com STAIR RAIL INSTRUCTIONS NOTE: Check with your local building code office for design load requirements for guard rails and bottom space requirements.
  • Page 2 Slide a bottom bracket cover onto each Leave the bracket covers taped in measure down 3/4" from the mark you end of the bottom rail, and temporarily place and cut each end of the rail at made on each post (Fig. 8). place the secure in place with tape.
  • Page 3 Insert an uncrimped baluster into each now repeat Step 3 using the top rail Remove tape and the top bracket cov- of the first and last routs of the bot- by penciling in a mark 3/8" in from the ers. Insert a square baluster into each tom rail, and set the top rail in place by ends of the bracket covers which are rout of the bottom rail.
  • Page 4 Hold the aluminum bracket in place on Repeat at the top of the stair section. Install bracket covers by wrapping them the end of the rail; mark the bottom of around the rails and aluminum brackets. place the assembled rail section into the aluminum bracket onto the post press the attachment tabs up into the the four aluminum brackets and secure...

Table of Contents