Summary of Contents for RDI Titan Pro Rail STAIR RAIL
Page 1
RAILING DYNAMICS, INC. FOR hOMe, FOR LIFe™ 135 STeeLmAnvILLe RoAd egg HARboR TownSHIp, nJ 08234 TeL: (877) 420-7245 FAx: (866) 277-5160 e-mAIL: cS@RdIRAIL.com URL: www.RdIRAIL.com STAIR RAIL INSTRUCTIONS NOTE: Check with your local building code office for design load requirements for guard rails and bottom space requirements.
Page 2
Slide a bottom bracket cover onto each Leave the bracket covers taped in measure down 3/4" from the mark you end of the bottom rail, and temporarily place and cut each end of the rail at made on each post (Fig. 8). place the secure in place with tape.
Page 3
Insert an uncrimped baluster into each now repeat Step 3 using the top rail Remove tape and the top bracket cov- of the first and last routs of the bot- by penciling in a mark 3/8" in from the ers. Insert a square baluster into each tom rail, and set the top rail in place by ends of the bracket covers which are rout of the bottom rail.
Page 4
Hold the aluminum bracket in place on Repeat at the top of the stair section. Install bracket covers by wrapping them the end of the rail; mark the bottom of around the rails and aluminum brackets. place the assembled rail section into the aluminum bracket onto the post press the attachment tabs up into the the four aluminum brackets and secure...
Need help?
Do you have a question about the Titan Pro Rail STAIR RAIL and is the answer not in the manual?
Questions and answers