Step 3: A/C Line Installation - Parks HP2000 XTREME Series Installation And Operator's Manual

Hide thumbs Also See for HP2000 XTREME Series:
Table of Contents

Advertisement

S T E P 3 : A / C L I N E I N S T A L L A T I O N
Two A/C lines must be run from the APU to the evaporator in order to supply Freon to the evaporator
unit.
Begin by installing check valve on the evaporator.
Apply a small amount of leak lock to the threads and secure to the bottom fitting on the
evaporator. BE SURE and use a backer wrench as you will damage the evaporator core
and cause it to leak.
Route the bare end of the two 8' A/C lines down through the 3" hole near the
evaporator unit.
Make sure both pre-crimped connectors are clean and clear of debris and that both
fittings contain one O-ring of the appropriate size.
23 |
P a g e

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents