Assembly Instruction – Proline Kitchen
chen
1. Carcass assembly
1. Carcass assembly
Cam lock and dowel assembly method
Kicker plate
Top panels
tant bracket
Carcass back
A
①
Attach side panels to back panel
Top panels
Divider panels
②
Attach base to carcass
Carcass back
Side panel
Divider panels
1
Attach side panels to back panel
Side panel
D
et assembly
③
Attach heat-resistant shields to carcass top
Kicker plate
Kicker plate
2
Attach base to carcass
②
Attach base to carcass
④
Attach carcass top
②
⑤
Attach base to carcass
Level the cabinet by adjusting the feet
③
Attach heat-resistant shields to carcass top
3
Attach heat-resistant shields to carcass top
③
Attach heat-resistant shields to carcass top
Turn unit right side up
Ensure the height from the ground to the top of the
carcass is minimum 735mm high in order to ensure
at least 5mm gap from the bottom of the waterfall
to the ground
Use M4 x 30mm screws to fix the heat-resistant shield
Heat-resistant bracket
Heat-resistant bracket
B
C
E
Feet assembly
F
Assembly Instruction – Proline Kitchen
Assembly Instruction – Proline Kitchen
Cam lock and dowel assembly method
Cam lock and dowel assembly method
①
Attach side panels to back panel
A
B
A
B
④
Attach carcass top
4
Attach carcass top
D
E
D
E
Turn unit right side up
5
Level the cabinet by adjusting the feet
④
Attach carcass top
⑤
Level the cabinet by adjusting the feet
④
Attach carcass top
Ensure the height from the ground to the top of the
Turn unit right side up
carcass is minimum 735mm high in order to ensure
Ensure the height from the ground to the top of the carcass
at least 5mm gap from the bottom of the waterfall
is minimum 735mm high in order to ensure at least 5mm
Turn unit right side up
to the ground
gap from the bottom of the waterfall to the ground
F
C
C
⑤
Level the
Feet assembly
F
Feet assembly
F
Ensure the
carcass is m
at least 5mm
to the groun
7
CARCASS ASSEMBLY
①
A
①
A
⑤
Le
⑤
Le
Ensur
carca
at lea
Ensu
to the
carca
at lea
to th