Kit Contents Kit Contents: Mounting Hardware: (1) Modular Shelf (9) 10-32 x .500 Pan Head Screw (2) Ball Bearing Slides (Left & Right) (9) 12-24 x .500 Pan Head Screw (2) Rear Rail Brackets (Left & Right) (9) 12-24 x Square Nut (1) Cable Managment Attachment (9) 12-24 x Cage Nut Assembly Hardware:...
Page 3
4Post Installation Instructions Step 3 Attach the Rails to the Rack: Attach the Front and Rear of the rails to the 4Post rack as shown below using supplied (4) 12-24 Pan Head Screws and (4) 12-24 Cage Nuts on each side. Repeat for the other side. 12-24 Pan Head Screw 12-24 Cage Nut Front Rack Attachment...
Page 4
Innovation First, Inc. warrants our products against defects in material and workmanship for a period of one (1) year from the date of purchase. Innovation First, Inc. liability shall be limited to repairing or replacing, at our option, any defective product.
Need help?
Do you have a question about the 115-6933 and is the answer not in the manual?