MAUTING Junior 03 Operating Instructions Manual

MAUTING Junior 03 Operating Instructions Manual

Smoking chamber

Advertisement

Operating Instructions
Production Number:
Year of Production:
Smoking Chamber
Junior 03
081/11
2011

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Junior 03 and is the answer not in the manual?

Questions and answers

Summary of Contents for MAUTING Junior 03

  • Page 1 Operating Instructions Smoking Chamber Junior 03 Production Number: 081/11 Year of Production: 2011...
  • Page 2: Table Of Contents

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 2 of 22 CONTENT: INTRODUCTION............................3 1.1. Usage ..............................3 GENERAL INSTRUCTIONS........................3 2.1. Safety ..............................3 2.2.
  • Page 3: Introduction

    1. INTRODUCTION 1.1. Usage Smoking chamber MAUTING Junior is equipment designed for small meat processing plants and also for restaurants. It makes possible to heat treatment of meat products, e.g. drying, smoking, cooking and roasting up to 160°C in one cycle without further manipulation, with manual control of flaps, glowing (smoking) and moistening.
  • Page 4: Safety Regulations - Organization Measures

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 4 of 22 · This symbol gives you warning that disobedience of this · order could cause life threatening by electrical current ·...
  • Page 5: Safety Regulations - Work With Smoke Generator

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 5 of 22 to the power supply. In case it is necessary to open the switchboard box or remove the protective cover, switch off the main breaker.
  • Page 6: Warning Labels Placement

    This machine is equipped by a safety accessory that protects operator and device. The main safety equipment consists of main power supply breaker and protective covers. There are informative and warning labels placed on the machine. MAUTING spol. s r.o. Type: UKM Junior...
  • Page 7: Technical Description

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 7 of 22 3. TECHNICAL DESCRIPTION 3.1. Operation conditions Electrical device is designed to flawless work under following climatic conditions : temperature from +5 to +30°C...
  • Page 8 Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 8 of 22 Another parts of the chamber are: · Chamber door – serves for closing inward chamber ambient from surroundings. It is made of mineral wool insulation, hinges, door handle and door seal.
  • Page 9 Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 9 of 22 OODEN CHIPS TRAY ASH TRAY ASH TRAY REGULATION Picture 2 Smoke generator · Tray support –serves for fixation of trays, grids or smoking sticks ·...
  • Page 10: Material

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 10 of 22 Picture No. 3 Control panel description Explanation: 1. Main power switch 6. Humidification switch Chambers type Junior can be equipped with doors made completely of stainless steal or with a view-through window and inward light.
  • Page 11: Operator

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 11 of 22 3.5. Operator · Before start of the machine make sure that all medias are available (water and electricity) ·...
  • Page 12 Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 12 of 22 · Open the door of chamber, pull out the piercing sensor (Pict.1) and take the products out of the chamber ·...
  • Page 13 Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 13 of 22 Flap opening in % Temperature Temperature Time in chamber Outlet Fresh air in core [°C] [min] [°C]...
  • Page 14: Installation Of Chamber

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 14 of 22 Flap opening in % Temperature Temperature Time in chamber Outlet Fresh air in core [°C] [min] [°C]...
  • Page 15: Acceptance, Delivery

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 15 of 22 b) Check the direction of rotation of the fan (the right direction is in view from above according to the watch-hand direction) c) Switch on and off several times.
  • Page 16: Packaging, Transportation, Storage

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 16 of 22 7. PACKAGING, TRANSPORTATION, STORAGE · Smoking chamber is transported by a common vehicle, mostly by a truck.
  • Page 17: Maintainace And Troubleshooting

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 17 of 22 2. Empty the drawer and the ash tray, lay down on the chamber floor if you...
  • Page 18: Malfunctions And Their Repairs

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 18 of 22 10. MALFUNCTIONS AND THEIR REPAIRS Please, see the description of the most probable failure causes of the chamber. It is supposed well-trained operator and well-done program in the control unit.
  • Page 19 Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 19 of 22 Malfunction cause Troubleshooting Malfunction Humidity does Open the water ball valve Water input is closed...
  • Page 20: Spare Part List

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 20 of 22 11. SPARE PART LIST SIEMENS 1LA 7080-3AA 1,1 kW 400V Č Č – –...
  • Page 21: Regulations And Standards

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 21 of 22 · flawless material manufacturing · correct assemblage · faultless function Guarantee is not valid for: ·...
  • Page 22: Bielak Antonin Ing. 2 Of

    Date: Smokehouse MAUTING Junior 1.7.2006 Worked out: Checked by: Approved by: Version No: 3 Page: Fila Petr Bielak Antonin Ing. Bielak Antonin Ing. 22 of 22 15. REMARKS It seems as a good idea if the end user will record some events of machine. These data could help the customer and also the manufacturer solving possible troubles occurring by usage of the equipment.

Table of Contents