Download Print this page

Watermark GB2 Installation, Operating And Care Instructions page 2

Grab bars

Advertisement

GB2
1. Screw posts (1) and (2) into wall studs with set screw holes pointing down and toward the center of the grab bar.
2. Slide post insert (3) into posts (1) and (2).
3. Tighten 2 set screws (4) into each post (1) and (2) to secure grab bar
1. Pull trim rings (2) off of mounting flanges (3) and
place around bar (1). Be careful not to scratch
finish.
2. Mark and drill holes into wall.
3. Screw mounting flanges (3) into wall.
4. Push trim rings (2) tight against wall and mounting
flanges (3).
350 DeWitt Avenue Brooklyn, NY 11207 USA T 718.257.2800 F 718.257.2144
GB4
GB3
1. Place fully assembled grab bar against wall and
mark and drill holes.
2. Remove front caps (5) and pull out bar (1).
3. Screw both mounting flanges into wall.
4. Push trim rings (2) tight against wall mounting
flanges (3).
5. Slide the bar (1) through both posts (4).
6. Screw large cap (5) into post (4) and bar (1) to
secure grab bar.
GB5
GB6
www.watermark-designs.com

Advertisement

loading

This manual is also suitable for:

Gb5Gb3Gb6Gb4