Black & Decker Price Pfister Portola 42 Series Manual page 3

Single control lavatory faucet
Hide thumbs Also See for Price Pfister Portola 42 Series:
Table of Contents

Advertisement

Available languages

Available languages

7
7E
7A
7D
7C
7 SECURING FAUCET
From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B) and
7
threading Long Nut (
/
Hex.) (7C) onto Mounting Post (7D). Make sure that the bumps
16
on Metal Washer (7B) are facing up. Tighten loosely, make sure Handle (7E) swings
equally in both directions. Firmly hand tighten Long Nut (7C). Make sure Lift Rod (7F)
moves freely. Secure Long Nut (7C) not to exceed a
Caution: Do not over tighten!
8
8A
8D
8B
HOT
8C
8 WATER SUPPLY CONNECTIONS
Gently separate hot and cold Supply Tubes (8A), approximately three inches apart.
Connect water Supply Lines (8C) to Faucet Inlets (8B). Hot water supply line goes to hot
inlet fitting indicated by red tag (8D). (Supply lines not included). Follow manufacturer's
instructions when installing supply lines. Do not twist Supply Tubes (8A)
ENGLISH
7F
7B
1
/
turn.
4
8A
8B
COLD
8C
DRAIN BODY INSTALLATION
9
9A
9 POP-UP INSTALLATION
Install and adjust Pop-Up (9A) using separate instructions supplied with the Pop-Up
assembly.
10
10 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
FAUCET FUNCTION
11
OPEN
11 VALVE FUNCTION
By lifting the Lever Handle (11A) up, the valve will be activated allowing water to flow.
The water flow will increase by continuing to lift up the Lever Handle (11A). By rotating
the Lever Handle counter-clockwise, the water temperature will decrease to cold flow
only. By rotating the Lever Handle clockwise, the water temperature will increased to
hot flow only.
Note: Flush faucet before turning on valve (see step 12)
3
11A
HOT
COLD
11A

Advertisement

Table of Contents
loading

Table of Contents