R. Lang Company ROLL AWAY 4000 Series Installation Instructions

Window screen

Advertisement

Quick Links

TOOLS REQUIRED:

Tape Measure
Phillips Head Screwdriver
Drill Motor & 3/32" Drill Bit
Pencil or Scriber
File
Scissors
Utility Knife
Level
Assembled Unit
Step 1
Verify Part Lengths Required
R2040 guides should measure the opening height minus 1 15/16".
The completed canopy assembly should measure the opening width minus 1/16".
Note: The Mesh Lock
end cap guide runners. A 1" wide, 8" long piece of thin cardboard
folded in the middle can be inserted into the guide channel to make
the bottom of the channel visible.
Date: 05/01/2019
ROLL AWAY
Installation Instructions
REVIEW ALL INSTRUCTIONS
BEFORE STARTING STEP 1
Partially
Flat Head Screw
#6 x 3/4"
can obscure the guide locks and canopy
TM
Tel: 800-677-5264 | Fax: 888-526-4329
R. Lang Company
Series 4000
®
(Window Screen)
IMPORTANT:
THOROUGHLY

PARTS INCLUDED:

R4060 & R4070 left and right
Guide Locks
With R4280 magnets installed
R2040 with
TM
Meshlock
Installed
Installation
Page 1 of 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ROLL AWAY 4000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for R. Lang Company ROLL AWAY 4000 Series

  • Page 1 R. Lang Company ROLL AWAY Series 4000 ® Installation Instructions (Window Screen) TOOLS REQUIRED: • Tape Measure • Phillips Head Screwdriver • Drill Motor & 3/32” Drill Bit • Pencil or Scriber • File • Scissors IMPORTANT: • Utility Knife REVIEW ALL INSTRUCTIONS •...
  • Page 2 R. Lang Company Step 2 Test & Pretension the screen for operation. The ROLL AWAY® window screen was shipped with a minimal amount of tension on the screen. Test the tension on the screen by holding the canopy horizontally, withdrawing the screen from the canopy, and allowing it to retract, taking care to keep the screen within the canopy end cap guide runners.
  • Page 3 R. Lang Company Assemble guides to canopy. Step 5 Preassemble the ROLL AWAY® screen on the fl oor or other fl at surface. Slide the guides (R2040) onto the canopy end cap guide runners, with the openings facing each other. Make sure they are placed on the correct sides of the canopy. The guide locks must be installed on the correct side of the canopy to operate.
  • Page 4 R. Lang Company Tension the screen and test for operation. Step 9 Tension the ROLL AWAY® window screen by drawing the screen out of the canopy approximately 8” (Figure 8) and add tension to the spring by engaging the tension adjustment screw with a #2 Phillips bit and turning the tension adjustment screw counterclockwise.
  • Page 5 Company will repair or provide replacement product, at its election, free of charge, for any product proven to have a manufacturing defect during the lifetime of the product up to a maximum liability which shall be equal to the cost of replacement of the defective product. R. Lang Company shall in no event be liable for labor charges or other expenses whatsoever in connection with removal or installation of either the original or replacement product.

Table of Contents