PB TEEN Metal Train Rack Assembly Manual

Advertisement

Metal Train Rack
This product is shipped as two pieces and must be assembled. Assembly is straight-forward
following the below instructions. Once assembled, the item is meant to be mounted to a wall.
Note: This item is meant for drywall/wood stud mounting only. If your walls are made from
concrete, brick or plaster, please consult your local hardware store for assistance. We
recommend that two people work together to install this item.

PARTS INCLUDED:

A
B
7PCS
1PC

ASSEMBLY INSTRUCTIONS:

1.
Attach the rack to the wood board by aligning the rack holes with seven threaded
holes.
2.
Spin nut (A) (clockwise) onto each exposed threaded portion of each threaded
stud by using the wrench (B) to tighten each nut.
C
D
1PC
2PCS
E
2PCS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Metal Train Rack and is the answer not in the manual?

Questions and answers

Summary of Contents for PB TEEN Metal Train Rack

  • Page 1 Metal Train Rack This product is shipped as two pieces and must be assembled. Assembly is straight-forward following the below instructions. Once assembled, the item is meant to be mounted to a wall. Note: This item is meant for drywall/wood stud mounting only. If your walls are made from concrete, brick or plaster, please consult your local hardware store for assistance.
  • Page 2 MOUNTING INSTRUCTIONS: Tools required (not included): Screwdriver, Level, Tape measure, Pencil, Stud-Finder This item is meant to be mounted to a wall using a French cleat mounting system which includes a wall-mounted cleat and a product-mounted cleat. The wall-mounted cleat is mounted to the wall using the provided fasteners and is thereafter used to engage with and support the product- mounted cleat to safely hold the item against the wall.
  • Page 3 CARE INSTRUCTIONS: *Dust often with a soft, dry cloth *Avoid using strong chemicals or abrasive cleaners. Thank you for your purchase www.pbteen.com...

Table of Contents