ADT Pulse Cloud Link Quick Installation Manual page 6

Table of Contents

Advertisement

Cloud Link Quick Installation Guide
When the Link Details screen (below) appears, the Cloud
Link has been enrolled. The Power and Service LEDs are
now both lit solid green.
8. Click the Go Back button on the upper left portion of the Link
Details screen.
The newly-added Cloud Link appears in the Links list.
9. Click Go Back on the upper left of the Links screen to exit.
6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cloud Link and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF