SELF TESTING MAINTAINED EMERGENCY ILLUMINATION SIGNS WITH WHITE LEDs
TECHNICAL CHARACTERISTICS
Mains voltage
Maximum power consumption
Battery (Ni-MH)
Battery protection
Indications
Recharging time
Minimum emergency duration
Light source intensity (230V) / (emerg.)
Degrees of cover protection
Produced in accordance with
Operation temperature range
Relative humidity
Construction materials
External panel's dimensions
External unit's dimensions
Typical weight
Guarantee
GENERAL
The luminaire consists mainly from two
parts, the body, where all the electronics
are located and the lamp-head where the
indication sign and the high efficiency
LEDs are located.
Maintained to non-maintained selection
capability
Power
on
the
continuously the TEST button for 10
seconds, until the led strip turns off.
Release the button and after a short
emergency test, the device operates as
non maintained. If you want to restore the
previous condition (maintained operation),
press continuously the TEST button for 10
seconds, until the led strip lights. Release
the button and after a short emergency
test, the device operates as maintained
illumination sign.
Battery Charging
The
battery
charging
controled. In this case, is achieved the
perfect battery maintenance , as well as the
elongation of its duration. When the battery
has completely charged, it charges with a
maintenance current.
Page 1 from 4
SLD-28/SP
100lm /100lm
EN 60598-1, EN 60598-2-22, ΕΝ 55015, ΕΝ 61547, ΕΝ 61000-3-2, ΕΝ 61000-3-3, EN 1838
280x120x15mm
Thank you for your trust in our products
Olympia Electronics - European manufacturer
device
and
press
is
completely
(for LED MODULE specifications see page 4)
SLD-34/SP
220-240V AC/50-60Hz
9 VA
3.6V/1.5Ah
Overcharging and deep discharging protection
Charge LED, Lamp LED, Fault LED, Test Button
5 to 40 C
up to 95%
Bayblend FR3010, aluminum, plexiglas
340x190x15mm
289x65x34mm
1110gr.
790gr.
3 years (1 year for the battery)
Battery Cut-off
The luminaire enters in this operation when
the mains power supply fails and battery
has lost its energy. During this operation
the luminaire enters the idle state and
battery consumption is negligible, in order
to be protected from deep discharge.
Manual Test
The manual test can be conducted only if
the mains power supply and the battery is
connected. By pressing the test button
briefly an operation test is initiated. During
this test period all indication LEDs are
OFF.
Automatic Operatioanal Test
This test includes all the operations that
provide the manual test and is conducted
automatically every 15 days. In order to be
performed, the mains power supply and
the battery should be connected.
Automatic Autonomous Test
The Automatic Autonomous Test is
conducted and measures the luminaire`s
back up operation. This test is conducted
automatically every six months. In order to
SLD-44/SP
9.5 VA
24h
3h
125lm /125lm
IP30
o
440x240x15mm
1580gr.
922044006_09_024