Download Print this page

Infinity Drain LTD-5 Series Installation

Advertisement

Quick Links

LTD-5

Parts List

Determining floor height
Finished floor height must be 1/16" higher at top edge of Infinity Drain
18 Secatoag Avenue, Port Washington, New York 11050 ● p:516.767.6786 f:516.740.3066 www.infinitydrain.com
Series
(A) Top frame
(B) Bottom frame
Weep holes
Waterproofing
membrane
(C) Fits standard
size residential
drains in Cast Iron,
ABS or PVC.

Installation Instructions

1.
Determine
(C) location. Connect to drain pipe.
2.
Create a pre-slope in four directions
towards drain body (C). Waterproof
to local code.
3.
Insert bottom frame (B) into clamp
down drain (C) and adjust height
as needed.
4.
Remove top frame (A) and install
tile within frame, using mortar and
thin set.
5.
Finish floor must be 1/16" higher
than top edge of bottom frame (B).
Infinity Drain recommends this product be
Figure 1
installed by a licensed contractor
Minimum height
≈ 3/4"
Maximum height
≈ 2⅛"
Figure 2
LTD-5 Installation
clamp
down
LTD-5
drain

Advertisement

loading

Summary of Contents for Infinity Drain LTD-5 Series

  • Page 1: Installation Instructions

    ABS or PVC. Infinity Drain recommends this product be Figure 1 installed by a licensed contractor Determining floor height Finished floor height must be 1/16″ higher at top edge of Infinity Drain Minimum height ≈ 3/4″ Maximum height ≈ 2⅛″...
  • Page 2 (B). Infinity Drain recommends this product be Figure 1 installed by a licensed contractor Determining floor height Finished floor height must be 1/16″ higher at top edge of Infinity Drain 1" Minimum height ≈ 1⅞″ 1¾"...