Download Print this page

Lanscape Forms Solstice Altair Installation Manual

Advertisement

Quick Links

Solstice: Altair, Cygnus
Installation Guide
Altair
Cygnus
Included components
8x ‐ panel
8x ‐ strut
Altair
1x ‐ Pole
8x – end cap nut
8x – #10‐24 x 1‐1/4" 
screw
Tools Required
• 7/32", 3/16" and 5/32" Allen head wrenches
• Flat blade screwdriver
For installing umbrella to table or stand:
• No. 2 Phillips screwdriver
• 7/16" wrench or adjustable wrench
• Proper personnel for lifting umbrella – weight is approximately 80 lbs.
ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish.  To protect 
this finish during assembly, place unwrapped powdercoated parts on packaging foam or other non‐
marring surface.  Do not place or slide powdercoated parts on concrete or other hard or textured 
surface – this will damage the finish causing rust to occur.  Use touch‐up paint on any gouges in the 
finish caused by assembly tools.
Umbrella
1x ‐ Top cap
Cygnus
1x – Strut ring
16x – 5/16‐18 x 1" 
1x – 3/8‐16 x 1‐1/4" 
screw
WARNING: SOLSTICE UMBRELLA MUST BE USED WITH SURFACE 
MOUNTED OR EMBEDDED TABLE OR SURFACE MOUNT STAND.
NOTE:  If specifying a Solstice umbrella with Landscape Forms' Charlie picnic tables, the 
surface mount stand must also be specified. For all other Landscape Forms tables or picnic 
tables, the umbrella secures to the table and no stand is required. The hardware for 
securing the umbrella to the table or stand is shipped with the support.
See separate installation guides for surface mount stand or table.
Storage: It is recommended to leave the Solstice unit installed all year. If the unit must be 
stored, remove from table or stand. Replace the bolt in the table or stand. Loosen top cap 
center screw and remove pole from canopy assembly. Replace screw in top of pole.
PROCEDURE FOR INSTALLATION:
Note: Do not fully tighten any hardware until the unit is completely assembled. As 
hardware is installed, tighten until just snug, then loosen 1/2 turn. Once unit is assembled, 
all hardware can be fully tightened.
Assemble umbrella on a non‐marring surface. Sufficient overhead clearance must be 
available before you begin. Avoid low hanging power lines.
1.
Install and anchor table or surface mount stand according to installation guides.
2.
Install strut ring on pole. See Fig. 1.
3.
Install the top cap with the 3/8‐16 x 1‐1/4" socket button head cap screw. See Fig. 2.
4.
Attach two struts to strut ring. See Figs 3a and 3b.
5.
Install one panel between the two struts. Fit holes in end caps over alignment pin at 
the end of each strut. Bolt to top ring. See Figs 4a, 4b and 4c.
screw
6.
Attach next strut, working in a counter‐clockwise direction when looking at the top of 
the umbrella. See Fig 5.
7.
Install next panel by repeating step 5. Bolt together the panel end caps using the #10‐
24 screw and end cap nut. Leave 1/8" gap between end caps. See Fig. 6.
8.
Rotate umbrella so that second installed panel is in the 6 o'clock position. See Fig. 7. 
9.
Repeat until all panels and struts are installed.  If it is difficult to connect the final end 
caps, relieve stress by adjusting the top of the panel connection. Check to ensure that 
all endcaps have 1/8" gap.
10. Once unit is fully assembled, tighten all hardware. Do not overtighten. Tighten end 
cap hardware first, strut ring hardware second, top ring hardware third and then the 
top cap center screw.
11. Lift  assembled umbrella into hole in table or surface mount stand, taking care not to 
scratch the tabletop.
12. Turn umbrella to align holes in support and pole. Insert 1/4‐20 bolt through holes and 
install locknut. This hardware is shipped with the table support or surface mount 
stand. The surface mount stand has two screws and locknuts.
Date: June 17, 2016
www.landscapeforms.com
Ph: 800.521.2546
Page 1 of 2

Advertisement

loading

Summary of Contents for Lanscape Forms Solstice Altair

  • Page 1 Solstice: Altair, Cygnus Umbrella Date: June 17, 2016 Installation Guide www.landscapeforms.com Ph: 800.521.2546 WARNING: SOLSTICE UMBRELLA MUST BE USED WITH SURFACE  MOUNTED OR EMBEDDED TABLE OR SURFACE MOUNT STAND. NOTE:  If specifying a Solstice umbrella with Landscape Forms’ Charlie picnic tables, the  surface mount stand must also be specified. For all other Landscape Forms tables or picnic  tables, the umbrella secures to the table and no stand is required. The hardware for  securing the umbrella to the table or stand is shipped with the support. See separate installation guides for surface mount stand or table. Altair Cygnus Storage: It is recommended to leave the Solstice unit installed all year. If the unit must be  Included components stored, remove from table or stand. Replace the bolt in the table or stand. Loosen top cap  center screw and remove pole from canopy assembly. Replace screw in top of pole. 8x ‐ panel PROCEDURE FOR INSTALLATION: 1x ‐ Top cap Note: Do not fully tighten any hardware until the unit is completely assembled. As  hardware is installed, tighten until just snug, then loosen 1/2 turn. Once unit is assembled,  all hardware can be fully tightened. 8x ‐ strut Assemble umbrella on a non‐marring surface. Sufficient overhead clearance must be  Cygnus Altair 1x –...
  • Page 2 Solstice: Altair, Cygnus Umbrella Date: June 17, 2016 Installation Guide www.landscapeforms.com Ph: 800.521.2546 Fig. 3b – Install struts Fig. 3a – Install struts Fig. 1 – Install strut ring Fig. 2 – Install top ring Fig. 4b – Install panel Fig. 4c – Install panel Fig. 4a – Install panel Fig. 5 – Install next strut Fig. 6– Install next panel Fig. 8 – Install last panel Fig. 7– Rotate partially  assembled unit Page 2 of 2...

This manual is also suitable for:

Solstice cygnus