Download Print this page

TIE DOWN TranzSporter 48469 Owner's Manual

Solar/plywood panel accessory for tp250/tp400 platform hoist

Advertisement

Quick Links

Color Logo use on white background only
Red: 0-100-100-0
Black Logo use on white background only
White Logo use on black background only
Information and Instructions, Visit the TranzSporter Web Site at
Solar/Plywood Panel Accessory for TP250 Platform Hoist
Kit Includes: solar brackets left and right, roof top anchor kit, cable drum assembly with extended cable,
Solar/Plywood Panel Accessory for TP400 Platform Hoist
Instructions #08243
Blue: PMS 293
100-56-0-0
For the Most Up to Date
www.tranzsporter.com.
Part #48469
solar/plywood carriage weldment.
Part #48467
Kit includes: solar brackets left and right, roof top anchor kit.
Both TP250/400 Models
Requires Secondary Handle Kit #48468
Solar/ Plywood
Panel Accessory
Owners Manual
Updated: 1/3/19
404-344-0000 • tiedown.com
605 Stonehill Drive SW, Atlanta, GA 30336
E1414; Rev. 1/3/19

Advertisement

loading
Need help?

Need help?

Do you have a question about the TranzSporter 48469 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for TIE DOWN TranzSporter 48469

  • Page 1 Color Logo use on white background only Blue: PMS 293 Red: 0-100-100-0 100-56-0-0 Solar/ Plywood Panel Accessory Black Logo use on white background only Owners Manual Updated: 1/3/19 For the Most Up to Date White Logo use on black background only Information and Instructions, Visit the TranzSporter Web Site at www.tranzsporter.com.
  • Page 2: Safety Instructions

    14. Do not operate indoors or in an area with poor ventilation. Electric motor model is excluded. 15. Never lift sheet or panel goods without the use of the plywood brackets and the tie down straps provided (see page 9).
  • Page 3 Cable Drum Replacement for the TP250 Hoist (Instructions for the TP400 Hoist skip to page 6.) In order for the Solar/Plywood carriage to function properly the cable drum must be replaced with higher capacity and longer length cable. Step #1 Lay the base section flat on the ground with back side up.
  • Page 4 Attach with a small cotter pin. Repeat for the other side. Release the brake handle. Brake Linkage Upper Brake Strap with Brake Post Lowest Brake Strap/Cotter Pin Tie Down • Atlanta, Georgia 30336...
  • Page 5 Carriage Replacement for the TP250 Hoist (Instructions for the TP400 Hoist skip to page 6.) In order for the Solar/Plywood carriage to function properly the TP250 Carriage must be replaced with the Solar/Plywood Carriage. Step #1 Adjustable Tension Remove the top cap with a 7/16” wrench. Bracket (one bolt/nut on each side) Step #2...
  • Page 6 Remove the nyloc nut/washer/lock washer from the top cap assembly, place the eye end over the bolt, replace the washer/lock washer and tighten the nyloc nut as shown right. Top Cap Washer Nyloc Nut Bolt Lock Washer Cable Eye/End Cable is looped around carriage pully Tie Down • Atlanta, Georgia 30336...
  • Page 7 Solar Panel/Carriage Assembly for the TP250/400 Hoist Refer to the TP250/400 Owners Manual instructions; determine hoist height needed and follow the track assembly instructions. Place the assembled hoist/carriage (without solar brackets) in the appropriate work site location. Place the base section at the proper “Base to Building” distance stated in the owners manual. Due to the size and positioning of the solar panels the Secondary Handle Kit (#48468) is required for operator safety.
  • Page 8 PERSONAL INJURY OR EVEN DEATH TO USER OR OTHERS • Use the proper tie down equipment - If you are not securing your cargo with the proper safety straps, it could come loose during lifting, resulting in injury or death.

This manual is also suitable for:

Tranzsporter 48467Tranzsporter 48468