Advertisement

Quick Links

C3 Cell Stand
EF-1085: C3 Cell Stand Package
Instruction Manual
October 2019

Advertisement

Table of Contents
loading

Summary of Contents for BASI C3

  • Page 1 C3 Cell Stand EF-1085: C3 Cell Stand Package Instruction Manual October 2019...
  • Page 2 BASi | C3 Cell Stand Copyright BASi 1997 – 2019 Bioanalytical Systems, Inc. www.basinc.com This instrument, either wholly or in part, is manufactured for research purposes only. Use for medical diagnosis is not intended, implied, or recommended by the manufacturer. Use for this purpose and accountability for same rest entirely...
  • Page 3 BASi | C3 Cell Stand SAFETY PRECAUTIONS The following general safety precautions must be observed during all phases of operation, service, and repair of this instrument. Failure to comply with these precautions or with specific WARNINGS, CAUTIONS, or NOTES elsewhere in this manual may impair the protection provided by the equipment.
  • Page 4 BASi | C3 Cell Stand IMPORTANT INFORMATION: Throughout the course of this manual, the following words and symbols will be used to designate important information: WARNING – This signifies extreme hazard. Not following the instructions may result in serious injury or death.
  • Page 5: Table Of Contents

    C3 to Non-BASi Instrument ........
  • Page 6: Section 1. Introduction

    BASi. The C3 Cell Stand interfaces directly with the Epsilon EClipse, EC Epsilon, and other non-BASi electrochemical analyzers. The cell can be enclosed in a Faraday Cage to minimize electrical interference. A built-in gas control allows purging or blanketing of the sample prior to or during analysis.
  • Page 7: Section 2. General Information

    To receive product update news and valuable information related to this and other BASi products, fill out and return the BASi Warranty Enrollment Card shipped with your C3 Cell Stand. We would like to know who you are and how we can meet your electrochemical analysis needs.
  • Page 8: Service

    BASi | C3 Cell Stand SERVICE BASi provides a skilled service staff to solve your equipment-oriented problems. For further details, call Customer Service at (765) 463-4527, ext 5809 or e-mail servicebasinc.com@basinc.com. Following discussion of your specific difficulties, an appropriate course of action will be described and the problem resolved accordingly. Do not return any products for service until you have a return authorization number (RA#).
  • Page 9: Section 3. Installation

    POWER REQUIREMENTS The C3 Cell Stand contains a fused, self-sensing power supply which can be powered by 120-240 V (50-60 Hz). It uses two 2 Amp fuses. Power requirements are shown on the back panel of the C3 (see Figure 1).
  • Page 10: Back Panel Controls And Connections

    SECTION 3 | INSTALLATION BASi | C3 Cell Stand FIGURE 1. FUSE PLACEMENT Back Panel Controls and Connections (See Figure 2) 1. Cell Lead Connector. 2. Remote Connector. 25-pin D connector for remote control of C3 3. Gas Inlet Connector for Cell Purging. Bulkhead fitting providing connection to external gas source (NOTE: 5 psi maximum).
  • Page 11: Connections

    Connection of the cell lead cable is also shown in Figure 3. The cell lead cable has a stainless steel LEMO connector at each end. One end is inserted into the CELL socket on the back of the C3. The other end is inserted into the CELL socket on the back of the BASi electrochemical analyzer.
  • Page 12: C3 To Non-Basi Instrument

    GAS INLET CONNECTION The C3 package contains 0.25” OD Tygon tubing and a gas line fitting. One end of the gas line fitting is barbed to fit inside the Tygon tubing. Push the barbed end into the tubing. The other end of the fitting connects to the GAS INLET port on the rear panel of the C3 (see Figure 4).
  • Page 13: Electrode Leads

    BASi | C3 Cell Stand SECTION 3 | INSTALLATION Note: The valve controlling the purge/blanket lines provides users precise control over the amount of gas flowing through the cell stand, and is NOT meant to be used as a switch to completely turn off the gas running through it.
  • Page 14: Section 4. Operation

    SECTION 4. OPERATION Front Panel Controls and Connections (see Figure 6) 1. Power LED. LED is lit when C3 is powered (on/off switch is located on back panel). 2. Stir-LED. LED is lit when stir is turned on, either manually or remotely.
  • Page 15 BASi | C3 Cell Stand SECTION 4 | OPERATION FIGURE 6. FRONT PANEL...
  • Page 16: Remote Control

    REMOTE CONTROL The remote connector of the C3 allows the stirring and gas purge functions to be controlled by an external unit. The cell stand was specifically designed to be controlled by the appropriate commands from BASi electrochemical analyzers. These functions can be ac- tivated by either a TTL signal or from any controller providing a contact closure to the ground.
  • Page 17: Section 5. Maintenance

    SECTION 5. MAINTENANCE GENERAL MAINTENANCE The C3 is a very rugged instrument and, with proper care, should give years of service. Following is a brief list of cautions and general maintenance considerations that will extend the lifetime of the instrument.
  • Page 18: Service Procedure

    SERVICE PROCEDURE There are no user-serviceable electronic parts in this unit and all service requests should be referred to BASi service personnel. In certain cases, BASi will provide electronic schematics and service procedures to qualified electronic maintenance facilities, but only upon written request and then only with the approval of the Service Coordinator.

Table of Contents