U.S. Boiler Company FDVS-56 Installation Instructions

Mpo-iq and emp direct vent conversion kit

Advertisement

A.
General. These instructions contain information to
convert from the MPO-IQ and EMP to Direct Vent.
B.

Materials provided with this kit.

1. Direct Vent Kit (see Table 1 for Part Number)
2. Installation Instructions
3. Conversion Label
4. Instruction Envelope Assembly
5. Direct Vent Clearance Label
C.

Removal of AFG Burner.

1. Unplug burner power cord from power outlet
receptacle located in lower right corner of
Front Jacket Panel.
2. Remove three (3) 5/16" -18 x 3/4" long Cap
Screws securing burner to Burner Swing Door.
3. Remove oil burner from opening of Burner
Swing Door.
Table 1: Direct Vent Kit Part Numbers
Direct Vent Kit Model FDVS-56
Direct Vent Kit Model FDVS-67
1
Description
Figure 1: Oil Burner Installation
Installation Instructions
MPO-IQ™ and EMP
Direct Vent Conversion Kit
D.
Installation of NX Burner. Refer to Figure 1.
1. Check oil nozzle in burner for size, angle and
type, inspect electrode settings, check head
setting, check air band and air shutter settings.
Refer to Table 2 of this supplement.
2. Place oil burner gasket on burner and align
holes.
!
Do not install burner without gasket
3. Thread (1) 5/16" -18 x 3/4" long cap screw,
approximately three (3) full turns, into tapping
located at 12:00 o'clock on burner swing door.
4. Insert oil burner into opening of burner swing
door. Align and engage keyhole slot in burner
flange over head of protruding cap screw
installed in previous Step. Rotate burner to the
right to lock flange behind head of cap screw.
Part No.
147/140
102130-02
1
102130-03
---
CAUTION
189/182
231/224
1
---
---
1
102142-04 - 8/19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FDVS-56 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for U.S. Boiler Company FDVS-56

  • Page 1 Table 1: Direct Vent Kit Part Numbers Description Part No. 147/140 189/182 231/224 Direct Vent Kit Model FDVS-56 102130-02 Direct Vent Kit Model FDVS-67 102130-03 Figure 1: Oil Burner Installation 102142-04 - 8/19...
  • Page 2 Table 2: Beckett NX Burner Settings Firing Rate Air Tube Head/Air Plate Boiler Size Part No. Oil Nozzle Pump Pressure (GPH) Combination Setting Hago 147/140 100240-02 1.00 NX70LB 2.75 0.85 - 60°B Hago 189/182 100240-03 1.30 1.00 1.00 - 45°B NX90LD Hago 231/224...

This manual is also suitable for:

Fdvs-67

Table of Contents