FieldPoint
cFP-20 xx Quick Start Guide
• cFP-20 xx LabVIEW RT controller
What You Need
• Mounting hardware (DIN rail, panel-
to Get Set Up
• I/O module(s)
• cFP-BP- x backplane, connector
M M o o u u n n t t t t h h e e C C o o m m p p a a c c t t F F i i e e l l d d P P o o i i n n t t B B a a c c k k p p l l a a n n e e
1
You can mount the cFP-BP- x backplane on a 35 mm DIN rail, on a panel, or in a standard 19 in.
rack. Before using any of these mounting methods, record the serial number from the back of
the backplane.
Each set of mounting instructions in this document includes an instruction to connect the
protective earth (PE) ground terminal on the cFP-BP- x backplane to the system safety ground.
The backplane PE ground terminal has the following symbol stamped beside it:
backplane PE ground terminal to the system safety ground using 14 AWG (1.6 mm) wire with a
ring lug. Use the 5/16 in. panhead screw shipped with the backplane to secure the ring lug to
the backplane PE ground terminal.
© National Instruments Corporation
TM
mount, or rack-mount accessory)
blocks, cables
• 11–30 V power supply
• Accessories: Ethernet cable,
number 2 Phillips screwdriver
• PC running Windows
• FieldPoint software 3.0.2 or later
• LabVIEW RT
1
. Connect the
cFP-20xx Quick Start Guide
Need help?
Do you have a question about the FieldPoint cFP-20 Series and is the answer not in the manual?
Questions and answers