Broadcast Tools DSD-2 Installation And Operation Manual

Dual sub-audible detector

Advertisement

Quick Links

®
Installation and Operation Manual
DSD-2
Dual Sub-audible Detector
Software Version 1.04 or above
Manual Update: 02/24/2006
Due to the dynamic nature of product design, the information contained in this
document is subject to change without notice. Broadcast Tools, Inc., assumes no
responsibility for errors and/or omissions contained in this document. Revisions
of this information or new editions may be issued to incorporate such changes.
Broadcast Tools® is a registered trademark of Broadcast Tools, Inc.
Copyright, 1989 - 2005 by Broadcast Tools, Inc. All rights reserved.
No part of this document may be reproduced or distributed without permission.
Visit www.broadcasttools.com for important product update information.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DSD-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Broadcast Tools DSD-2

  • Page 1 Manual Update: 02/24/2006 Due to the dynamic nature of product design, the information contained in this document is subject to change without notice. Broadcast Tools, Inc., assumes no responsibility for errors and/or omissions contained in this document. Revisions of this information or new editions may be issued to incorporate such changes.
  • Page 2: Safety Information

    Thank you for your purchase of the Broadcast Tools® Dual Sub-Audible Tone Broadcast Tools® Detector, which we will refer to throughout the manual as the DSD-2. We’re con- Products, as with any fident this product will give you many years of dependable service.
  • Page 3: Product Description

    LED’s and level control. The DSD-2 is powered by a surge protected internal bi- polar 15vdc power supply affording superior headroom and high definition audio. The DSD-2 may be set on a desktop, mounted on a wall or up to three units may be mounted on the optional RA-1, Rack-Able mounting shelf.
  • Page 4: Installation

    Ground terminals. The station ground should be connected to the chassis ground screw located on the far right side of the DSD-2 as viewed from the rear or the ”EGND” euroblock screw terminal. It is recommended that all cables connected to the DSD-2 be looped through ferrite cores to suppress RF.
  • Page 5: Operation

    100ms tone detection time. Operation Power Insert the power plug into the power jack on the DSD-2 and the wall transformer into the proper AC outlet. Verify that the power LED is lit. The Activity LED is set to trip at levels above –30dBu. For reliable tone detection, feed the DSD-2 with program levels above 0dBu.
  • Page 6: Specifications

    DSD-2 Installation and Operation Manual Specifications Input Level -20dBu to +24dBu 10K Ω balanced. Input Impedance Frequency Response 50 to 20kHz +/- 0.5dB (High-Pass filter). Distortion <.01%HD / IMD Noise <85dB Ref 100 Ω, balanced Output Impedance Tone detection trip level -20dBu, minimum, adjustable via R43.
  • Page 7: Limited Warranty

    If Broadcast Tools is notified, in writing, of a failure of any item manufactured by Broadcast Tools to conform to the foregoing Limited Warranty within one (1) year following the date of the Buyer’s acquisition of the item, and if the item is returned to Broadcast Tools in accordance with Broadcast Tools’...
  • Page 8: Section Title

    - - m m a a i i l l : : support@broadcasttools.com v v o o i i c c e e : : 360.854.9559 f f a a x x : : 360.854.9479 Visit us online at www.broadcasttools.com Copyright © 1989-2005 by Broadcast Tools, Inc. All Rights Reserved.

Table of Contents