DECKORATORS ALX CONTEMPORARY PRE-ASSEMBLED RAILING Installation Instructions

Advertisement

Items and Tools Needed

Parts included
(1) Pre-assembled panel
(4) Rail support connectors for 6ft
(2) Rail supports for 6ft
(6) Rail support connectors for 8ft
(3) Rail supports for 8ft
(4) Brackets with hardware
(Posts and stair rail kits sold separately)
Tools required
• Carpenter's pencil
• Drill/power screwdriver
• Adjustable wrench
• Miter or circular saw
with carbide tip blade
• Marked speed square
• Safety glasses/
• Carpenter's level
(1) Pre-assembled Panel
(2 or 3) Rail Supports

Posts Installation

Prior to construction:
• Check with your local regulatory agency for special code requirements
in your area. Common railing height is 36" or 42". Read instructions
completely to get an understanding of how the product goes together and
how each piece affects the other.
• Determine the number of railing posts needed for your deck. Post
spacing is 6' or 8' on-center. Example: A 12' x 16' deck attached to a
building with a 4' access opening on one side will need a total of eight
posts.
Step 1 Install posts by attaching the aluminum base to the surface of the
deck. Position the post so the fastener will go into the floor joist, and make
sure the decking is firmly attached to the joist at the location of the posts.
If necessary, use wood blocking securely attached to the joist structure
as reinforcement underneath the decking where the posts are located.
Fasteners that hold the post base to the surface should be able to secure
to joist or reinforcement braces, not just the decking itself. Note: When
installing aluminum post on top of a wood surface, screws must be lagged
into at least 3" of solid wood (not including the decking). 5/4" or 1 1⁄2" deck
boards do not provide sufficient material for a safe installation. If necessary,
add additional material to the underside of the surface (fig. 2).
Step 2 Position the post assembly onto the location where it will attach
to the deck. Four 3/8" diameter mounting holes are provided on the base.
When the final position is determined, mark the base hole locations.
Remove the post assembly and drill 15/64" holes in the marked locations
through the decking and into structural blocking.
Step 3 Reposition the post assembly with the leveling plate inserted
between the deck and the post base, and aligned with the predrilled holes.
Insert the post fasteners (NOT INCLUDED), and partially tighten. Using a
level, adjust the leveling set screws with a 3/16" allen wrench until the post
is plumb. Fully tighten the post fasteners to secure the base to the deck
structure. Note: Recommended 5/16" x 4" or longer lag screws.
STOP – Make sure post base trim is installed before continuing.
• Rubber mallet
• Tape measure
or socket wrench
• Lag screws
for bolts, etc.
• 3/16" allen
wrench
goggles
(4 or 6) Rail Support Connectors
In-Line Railing Installation Instructions
ALX CONTEMPORARY PRE-ASSEMBLED RAILING
INSTALLATION INSTRUCTIONS
Post Cap
39-in
Post
Post
Base
Trim
Leveling
Plate
(2) Top Rail Brackets
(2) Bottom Rail Brackets
Pre-Assembled Panel
Rail
Support
(12) Metal Screws
Bracket
fig. 1
(4) Large Screws
(4) Small Screws
fig. 2
fig. 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ALX CONTEMPORARY PRE-ASSEMBLED RAILING and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for DECKORATORS ALX CONTEMPORARY PRE-ASSEMBLED RAILING

  • Page 1 ALX CONTEMPORARY PRE-ASSEMBLED RAILING INSTALLATION INSTRUCTIONS • Items and Tools Needed Post Cap Pre-Assembled Panel 39-in Parts included • Post • (1) Pre-assembled panel (4) Rail support connectors for 6ft Bracket • (2) Rail supports for 6ft (6) Rail support connectors for 8ft...
  • Page 2 Railing Installation Prior to construction: • Check building code requirements for maximum spacing between deck surface and bottom of rail (sweep). Spacing of 3” is recommended for 36” or 42” finished rail height. Step 1 Measure the distance between installed posts to determine the length of the top and bottom rails. Position rail adjacent to installed posts.
  • Page 3 EITHER EXPRESS OR IMPLIED, AND SHALL NOT BE LIABLE FOR ANY DAMAGES, INCLUDING CONSEQUENTIAL DAMAGES. ©2019 Universal Forest Products. Deckorators is a registered trademark of Deckorators, Inc. in the U.S. All rights reserved. 68956 U.S. Highway 131, White Pigeon, MI 49099 10930 12/19 www.deckorators.com...

Table of Contents