Download Print this page

SBE 50259 Installation

Sbe 9plus to benthos altimeter mount kit

Advertisement

Quick Links

SBE P/N 50259
SBE 9plus to Benthos Altimeter Mount Kit
KIT CONTENTS
SBE P/N
Manufacturer P/N
231717
Sbe9+ Cage Mod Insulator
30195
Bolt, 3/8-16 x 1-1/2 Hex
30210
Nut, 3/8-16, Nylon stop, SS
30257
Washer, 3/8" Flat, SS
A. PLEASE NOTE
1. This installation is done outside the cage perimeter.
2. It is not intended for use in a free floating 9plus for profiling applications.
3. Instead, it is intended for use in a horizontally mounted, carousel environment, where the Benthos
will still be protected while residing outside of the cage.
B. Installing the Benthos
1. Install insulators (231717) onto each side of the Benthos mounting holes.
2. Fit one washer (30257) over each bolt (30195), and slide bolts through the Benthos mounting
holes.
3. Mount Benthos onto the 9plus cage on either side of the top cage bar.
PLEASE NOTE: Your cage must b modified in order to accommodate installing this assembly.
Otherwise, you will need to find a way to drill 2 holes into the top bar yourself.
4. Secure from other side of cage bar with an additional washer (30257) and 1 nut (30210) onto each
bolt.
5. Tighten hardware with a box wrench to insure an adequate torque.
SBE DRAWING: 41048
TITLE: SBE-9 Benthos Alt Mount
REV:
S E A - B IR D
ELE C T R O N IC S, I N C.
1808 136th Place N.E., Bellevue, Washington 98005 USA
Telephone: (425) 643-9866 Telex: 292915 SBEI UR
Fax: (425) 643-9954
Primary SBE Application
Provide electrical insulation between Benthos, screws, and cage
Securing bolts for mounting assembly
Used with mounting assembly securing bolts.
Used with mounting assembly securing bolts.
I
n
s
t
a
I
n
s
t
a
Sea-Bird Electronics Procedure
PROCEDURE NUMBER: 67093
TITLE: SBE 9plus to Benthos Altimeter Mount Kit
REVISION:
EFFECTIVE DATE: 11/25/2002
CHECKED BY: _____________ PAGE 1 of 1
email: seabird@seabird.com
DATE
SYM
REVISION RECORD
l
l
i
n
g
B
e
n
t
h
o
s
i
n
t
l
l
i
n
g
B
e
n
t
h
o
s
i
n
t
AUTH
DR
QTY
4
2
2
4
o
t
h
e
9
p
l
u
s
c
a
g
e
o
t
h
e
9
p
l
u
s
c
a
g
e
CHK

Advertisement

loading

Summary of Contents for SBE 50259

  • Page 1 5. Tighten hardware with a box wrench to insure an adequate torque. SBE DRAWING: 41048 Sea-Bird Electronics Procedure PROCEDURE NUMBER: 67093 TITLE: SBE-9 Benthos Alt Mount TITLE: SBE 9plus to Benthos Altimeter Mount Kit REVISION: REV: EFFECTIVE DATE: 11/25/2002 CHECKED BY: _____________ PAGE 1 of 1...