Download Print this page

Balboa Mach 2.1 EL Series Installation And Configuration Manual

Spa controllers

Advertisement

Quick Links

Basic Installation and Configuration Guidelines for
Mach 2.1 EL-Series Spa Controllers.
IMPORTANT: The System must be properly mounted. Do not rely on the plumbing
connection to support the system. Regular operation will cause excessive vibration and
potential damage to the system unless it is mounted securely.
Use minimum 6AWG copper conductors only.
Torque field connections between
21 and 23 in lbs.
Readily accessible disconnecting means to be
provided at time of installation
Permanently connected
Connect only to a circuit protected by a Class A
Ground Fault Circuit Interrupter (GFCI) mounted at
least 5' (1.52M) from the inside walls of the
tub and in line of sight from the equipment
compartment.
CSA enclosure: Type 2
Refer to Wiring Diagram inside the cover of the control enclosure.
Refer to Installation and Safety Instructions provided by the spa manufacturer.
Warning:
People with infectious diseases should not use a spa or hot tub.
Warning:
To avoid injury, exercise care when entering or exiting the spa or hot tub.
Warning:
Do not use a spa or hot tub immediately following strenuous exercise
Warning:
Prolonged immersion in a spa or hot tub may be injurious to your health
Caution:
Maintain water chemistry in accordance with the Manufacturers instructions.
Caution:
The equipment and controls shall be located not less than 1.5 meters horizontally from
the spa or hot tub.
Compatible with system software rev 100-1xx-10 or higher
© Copyright 2006 Balboa Instruments, Inc.
GREEN
WHITE
BLACK
Doc P/N 40232 Rev. B
FOR W-WIRES
WHITE AC (120 V)
J23 J19 J28
J43 J42 J48
RED
J53 J54
FOR W-WIRES
J55 J25
RED AC (240 V)
J26
Typical field connections for main power.
04-05-2006
120V
Heater
Jumper
(remove
for 240V
Heater)
Doc P/N 40232 Rev. B

Advertisement

loading

Summary of Contents for Balboa Mach 2.1 EL Series

  • Page 1 Compatible with system software rev 100-1xx-10 or higher Doc P/N 40232 Rev. B 04-05-2006 © Copyright 2006 Balboa Instruments, Inc. Basic Installation and Configuration Guidelines for Mach 2.1 EL-Series Spa Controllers. IMPORTANT: The System must be properly mounted. Do not rely on the plumbing connection to support the system.
  • Page 2 CSA Compliance/Conformité Caution: Test the ground fault circuit interrupter before each use of the spa. • • Read the instruction manual. • Adequate drainage must be provided if the equipment is to be installed in a pit. • For use only within an enclosure rated CSA Enclosure 3. •...
  • Page 3 EL Series Mach 2.1 Edit Menu The Mach 2 EL systems (2.1 and higher) have a new user interface called the Edit Menu. This menu contains several submenus to allow changing various settings from a panel. Note: in the following discussion, the ‘Temp’ button can be Warm, Cool, or Temp, depending on the type of panel used.
  • Page 4 System firmware may be updated from time to time. If your spa is ever reprogrammed with new firmware, request a new Installation and Configuration Guide to determine if any new user settings have been made available. Call Balboa at 800-645-3201 for information regarding updated documentation and software.